Created: Jan 12, 2024
Due: Jan 22, 2024 (935 days overdue)
📅
646.6 daysTotal Age
⏱️
4.0d in Ready for SchedulingLongest Stage
🔄
2 transitionsStatus Changes
⚠️
3.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
0 linesWork Details
AI Analysis
Powered by OpenAI
Generating AI analysis...
On Track
On Hold • 944 days old
🚨
Primary Delay4.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay3.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
4.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
1/12/24 RCook- Email from POC stating she does not want to schedule this location yet. States location will be moving around May-June. Per teams chat from HGuzman she is reaching out to account to advise on how to proceed.
⚠️Problem Description
Tech: Mike Huffman
Remove existing light head(s), replace with new ones. Return old head(s) to Waldmann. Reach out to Heather Guzman (SOM) when you are ready to ship the old light heads back and she will facilitate getting the shipping label from Waldmann, or follow directions below (#3 in Special Items to note).
Southfield - This location has 1 light head to replace
1. Please attach the file to each of these WO's that I have attached to this email.
2. Lights will be shipped to technician.
3. RMA information on returning lights must be provided in the work order in the Special Instructions. Waldmann will provide this information and the shipping information.