Created: Dec 30, 2024
Due: Dec 31, 2025
Completed: Dec 24, 2025 (7 days early)
📅
257.3 daysTotal Age
⏱️
88.7d in ScheduledLongest Stage
🔄
10 transitionsStatus Changes
⚠️
87.5d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 500 days old
🚨
Primary Delay88.7 days stuck in "Scheduled"
⏱️
Total Delay87.5 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
64.7d
Canceled
2.2d
Ready for Release
102.6d
Assigned
0.0d / 0.5d SLA
Scheduled
91.5d / 2.0d SLA
Closed
0.4d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2/25 KHardison, cancelled. Combined PM with repair WO.
3/4 KHardison, Cancelling, adding to repair WO.
🔧Work Performed
**PM Completed.
**Lightly dusted inside and outside of higi
**Checked and calibrated audio & volume, BP, touch screen and weight bench.
**Wiped down higi with disinfectant cleaner
**Tested for functionality
**Completed full test successfully
**Verified/Changed BIOS setting to “POWER ON”
🔍Technician Findings
Unit in service
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
Work Order: WO-01227629
Account: HIGI LLC
Customer Case Number:
Location: Stop&Shop 427
Address: 221 Huttleston Avenue, Fairhaven, MA 02719
Manufacturer: Merge SH Holdings, Inc.
Model #: KMY8202F
Serial #: KMY-120328650-468
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2025
Schedu