Created: Dec 30, 2024
Due: Dec 31, 2025
Completed: Nov 15, 2025 (46 days early)
📅
229.3 daysTotal Age
⏱️
134.0d in Ready for ReleaseLongest Stage
🔄
11 transitionsStatus Changes
⚠️
27.6d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 500 days old
🚨
Primary Delay134.0 days stuck in "Ready for Release"
⏱️
Total Delay27.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
66.3d
Ready for Release
134.0d
Assigned
0.2d / 0.5d SLA
Scheduled
31.6d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.8d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
10/3/25 RCook- Reassigning WO to Joey Anderson
🔧Work Performed
PM Service
🔍Technician Findings
Fully functioning Kiosk and online
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Green Kiosk with a Wifi Installed and Storm Key pad