Last business day of January 2025 · Target: Jan 31, 2025
✗ SLA Missed (220 biz days late)
Active: 241 biz days
Paused: 162 biz days
🕐 Clock stopped: Completed (Aug 13, 2026)
236d
▶ Clock Running
Status: Created
Jan 2 → Dec 12, 2025
236 business days (counted)
Running total: 236 of ? biz days used
⏸149d
⏸ Clock Paused
Status: Ready for Release
Dec 12 → Jul 20, 2026
149 business days (not counted)
▶ Clock Running
Status: Scheduled
Jul 20 → Jul 21, 2026
1 business day (counted)
Running total: 237 of ? biz days used
▶ Clock Running
Status: Entered
Jul 21 → Jul 21, 2026
0 business days (counted)
Running total: 237 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Jul 21 → Aug 7, 2026
13 business days (not counted)
▶ Clock Running
Status: Scheduled
Aug 7 → Aug 13, 2026
4 business days (counted)
Running total: 241 of ? biz days used
Created: Jan 2, 2025Completed: Aug 13, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 2 → Dec 12
Created
▶ Running
236
236
Dec 12 → Jul 20
Ready for Release
⏸ Paused
149
—
Jul 20 → Jul 21
Scheduled
▶ Running
1
237
Jul 21 → Jul 21
Entered
▶ Running
0
237
Jul 21 → Aug 7
Ready for Release
⏸ Paused
13
—
Aug 7 → Aug 13
Scheduled
▶ Running
4
241
Holding399.7d (excluded)
Coordinators6.6d
Field Work0.0d
✗ SLA Missed
Holding(excluded from total)
399.7 days
Coordinators
6.6 days
Over SLA
Field Work
0.0 days
Created: Jan 2, 2025
Due: Dec 31, 2026 (139 days left)
📅
403.1 daysTotal Age
⏱️
236.5d in On HoldLongest Stage
🔄
7 transitionsStatus Changes
⚠️
2.6d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
On Track
Ready to Bill • 588 days old
🚨
Primary Delay236.5 days stuck in "On Hold"
⏱️
Total Delay2.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
236.5d
Ready for Release
163.2d
Scheduled
6.6d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
CVS
Performed PM procedure
Completed and uploaded checklist
Functional test
BP stop button working as expected
Replaced inspection label
🔍Technician Findings
Kiosk operational
⚠️Problem Description
Please Perform PM: PM Checklist can be found as a link in the work order under WO actions
If Kiosk is not on the Sales floor request to speak to a manager to find out if kiosk is being stored in the back room or if it was disposed. Offer to help bring the kiosk to the salesfloor or advise that EMSAR can replace a disposed kiosk. If store does not want to bring the kiosk out of storage or if kiosk was disposed, close out work order with Repair code '37 Store intervention required' and document who you spoke with and outcome of conversation. Labor line shall be a trip charge.
***Important: Please make sure to document if kiosk is disposed or in storage***
If kiosk fails a PM, checklist is still required to be completed. Please use Code 35 - Follow up needed and detail in the Tech Findings, Work Performed and Final condition the result and cause for a follow up. Close out the work order. Dispatch will create a follow up repair work order to send parts.