Last business day of January 2025 · Target: Jan 31, 2025
✗ SLA Missed (216 biz days late)
Active: 237 biz days
Paused: 79 biz days
🕐 Clock stopped: Completed (Apr 9, 2026)
236d
▶ Clock Running
Status: Created
Jan 2 → Dec 12, 2025
236 business days (counted)
Running total: 236 of ? biz days used
⏸79d
⏸ Clock Paused
Status: Ready for Release
Dec 12 → Apr 8, 2026
79 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 8 → Apr 8, 2026
0 business days (counted)
Running total: 236 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 8 → Apr 9, 2026
1 business day (counted)
Running total: 237 of ? biz days used
Created: Jan 2, 2025Completed: Apr 9, 2026
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 2 → Dec 12
Created
▶ Running
236
236
Dec 12 → Apr 8
Ready for Release
⏸ Paused
79
—
Apr 8 → Apr 8
Assigned
▶ Running
0
236
Apr 8 → Apr 9
Scheduled
▶ Running
1
237
Holding316.2d (excluded)
Coordinators2.0d
Field Work0.0d
Billing19.2d
✗ SLA Missed
Holding(excluded from total)
316.2 days
Coordinators
2.0 days
Field Work
0.0 days
Billing
19.2 days
Over SLA
Created: Jan 2, 2025
Due: Dec 31, 2026
Completed: Apr 9, 2026 (266 days early)
📅
316.5 daysTotal Age
⏱️
236.5d in On HoldLongest Stage
🔄
7 transitionsStatus Changes
⚠️
16.4d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 588 days old
🚨
Primary Delay236.5 days stuck in "On Hold"
⏱️
Total Delay16.4 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
236.5d
Ready for Release
79.7d
Scheduled
2.0d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.1d / 1.0d SLA
Ready to Bill
16.3d / 1.0d SLA
Invoice Pending
2.9d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
4/10/26 lcoonrod
marking as follow up complete. This is not a follow up. It is store intervention. "wall outlet falling out of wall."
🔧Work Performed
On arrival, unit was up and running. LEDs functioning. Cabinetry tight and intact.
However.. I noticed the outlet box was yanked out of the wall. Advised store manager Linda of my findings. She took a picture and said she was going to report it to facilities on her end. Creating store intervention follow-up for this issue as well.
Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
🔍Technician Findings
On arrival, unit was up and running. LEDs functioning. Cabinetry tight and intact.
However.. I noticed the outlet box was yanked out of the wall. Advised store manager Linda of my findings. She took a picture and said she was going to report it to facilities on her end. Creating store intervention follow-up for this issue as well.
Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
⚠️Problem Description
Please Perform PM: PM Checklist can be found as a link in the work order under WO actions
If Kiosk is not on the Sales floor request to speak to a manager to find out if kiosk is being stored in the back room or if it was disposed. Offer to help bring the kiosk to the salesfloor or advise that EMSAR can replace a disposed kiosk. If store does not want to bring the kiosk out of storage or if kiosk was disposed, close out work order with Repair code '37 Store intervention required' and document who you spoke with and outcome of conversation. Labor line shall be a trip charge.
***Important: Please make sure to document if kiosk is disposed or in storage***
If kiosk fails a PM, checklist is still required to be completed. Please use Code 35 - Follow up needed and detail in the Tech Findings, Work Performed and Final condition the result and cause for a follow up. Close out the work order. Dispatch will create a follow up repair work order to send parts.