Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01233451 ↗ ServiceMax

CVS • Preventive Maintenance • PSM

📍 CVS - CVS-02900 — 34344 North Highway 45, Grayslake IL, 60030

Jan 2, 2025 → Jul 22, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2025 · Target: Jan 31, 2025
✗ SLA Missed (224 biz days late)
Active: 245 biz days
Paused: 142 biz days
🕐 Clock stopped: Completed (Jul 22, 2026)
236d
▶ Clock Running
Status: Created
Jan 2 → Dec 12, 2025
236 business days (counted)
Running total: 236 of ? biz days used
⏸84d
⏸ Clock Paused
Status: Ready for Release
Dec 12 → Apr 15, 2026
84 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 15 → Apr 15, 2026
0 business days (counted)
Running total: 236 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 15 → Apr 22, 2026
5 business days (counted)
Running total: 241 of ? biz days used
▶ Clock Running
Status: Entered
Apr 22 → Apr 22, 2026
0 business days (counted)
Running total: 241 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Apr 22 → Apr 22, 2026
0 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 22 → Apr 22, 2026
0 business days (counted)
Running total: 241 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 22 → Apr 27, 2026
3 business days (counted)
Running total: 244 of ? biz days used
▶ Clock Running
Status: Entered
Apr 27 → Apr 27, 2026
0 business days (counted)
Running total: 244 of ? biz days used
⏸58d
⏸ Clock Paused
Status: Ready for Release
Apr 27 → Jul 21, 2026
58 business days (not counted)
▶ Clock Running
Status: Assigned
Jul 21 → Jul 21, 2026
0 business days (counted)
Running total: 244 of ? biz days used
▶ Clock Running
Status: Scheduled
Jul 21 → Jul 22, 2026
1 business day (counted)
Running total: 245 of ? biz days used
Created: Jan 2, 2025 Completed: Jul 22, 2026
Show SLA Clock Detail (12 periods)
Period Status Clock Biz Days Running Total
Jan 2 → Dec 12 Created ▶ Running 236 236
Dec 12 → Apr 15 Ready for Release ⏸ Paused 84
Apr 15 → Apr 15 Assigned ▶ Running 0 236
Apr 15 → Apr 22 Scheduled ▶ Running 5 241
Apr 22 → Apr 22 Entered ▶ Running 0 241
Apr 22 → Apr 22 Ready for Release ⏸ Paused 0
Apr 22 → Apr 22 Assigned ▶ Running 0 241
Apr 22 → Apr 27 Scheduled ▶ Running 3 244
Apr 27 → Apr 27 Entered ▶ Running 0 244
Apr 27 → Jul 21 Ready for Release ⏸ Paused 58
Jul 21 → Jul 21 Assigned ▶ Running 0 244
Jul 21 → Jul 22 Scheduled ▶ Running 1 245
Holding 380.8d (excluded)
Coordinators 11.4d
Billing 8.9d
✗ SLA Missed
Holding (excluded from total)
380.8 days
Coordinators
11.4 days
Over SLA
Billing
8.9 days
Over SLA
Created: Jan 2, 2025 Due: Dec 31, 2026 Completed: Jul 22, 2026 (162 days early)
📅
387.5 days Total Age
⏱️
236.5d in On Hold Longest Stage
🔄
12 transitions Status Changes
⚠️
13.2d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 588 days old
🚨
Primary Delay 236.5 days stuck in "On Hold"
⏱️
Total Delay 13.2 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
236.5d
Ready for Release
144.3d
Scheduled
11.4d / 2.0d SLA
Assigned
0.0d / 0.5d SLA
Closed
0.0d / 1.0d SLA
Ready to Bill
8.9d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
Attempted to get pressure to hold multiple times via calibrated manometer - unable to hold pressure successfully. Self BP test performed - cuff deflated rapidly - Error 2 test fail.
🔍 Technician Findings
Unable to perform 250 mmHg cal. Unit unable to hold pressure at any level (50, 100, 150, 200, 250). Attempted to run self BP test - cuff deflated rapidly during test - Error 2.
⚠️ Problem Description
Please Perform PM: PM Checklist can be found as a link in the work order under WO actions If Kiosk is not on the Sales floor request to speak to a manager to find out if kiosk is being stored in the back room or if it was disposed. Offer to help bring the kiosk to the salesfloor or advise that EMSAR can replace a disposed kiosk. If store does not want to bring the kiosk out of storage or if kiosk was disposed, close out work order with Repair code '37 Store intervention required' and document who you spoke with and outcome of conversation. Labor line shall be a trip charge. ***Important: Please make sure to document if kiosk is disposed or in storage*** If kiosk fails a PM, checklist is still required to be completed. Please use Code 35 - Follow up needed and detail in the Tech Findings, Work Performed and Final condition the result and cause for a follow up. Close out the work order. Dispatch will create a follow up repair work order to send parts.
📄 Description
Model 300 with Backboard

Timeline

📋
Work Order Created Jan 2, 3:16 PM
Work Order: WO-01233451
Type: Preventive Maintenance
Priority: PSM
🚨 237.0 business days
Status: Ready for Release by Stephanie Ramen Dec 12, 1:08 PM
From: On Hold
To: Ready for Release
Duration in Previous: 343d 21h
🚨 85.0 business days
👷
3 Technician Assigned Apr 15, 10:53 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 123d 20h, 0m
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-04-24T17:00:00.000+0000
⚠️ 6.0 business days
🆕
Status: Entered by Kaitlyn Kelch Apr 22, 12:13 PM
From: Scheduled, Entered
To: Entered, Ready for Release
Duration in Previous: 7d 1h, 0m
👷
4 Technician Assigned Apr 22, 5:02 PM
Technician Assigned → Status: Assigned → Status: Scheduled → Dispatch Scheduled
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Release
To: Assigned
Duration in Previous: 4h 49m
🗓️
Status: Scheduled by Kaitlyn Kelch
From: Assigned
To: Scheduled
Duration in Previous: 4m
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-05-01T15:30:00.000+0000
3.9 business days
🆕
Status: Entered by Kaitlyn Kelch Apr 27, 12:09 PM
From: Scheduled, Entered
To: Entered, Ready for Release
Duration in Previous: 4d 19h, 0m
🚨 59.0 business days
👷
4 Technician Assigned Jul 21, 11:48 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled → Status: Scheduled
👷
Status: Assigned by Rhea Berry
From: Ready for Release
To: Assigned
Duration in Previous: 84d 23h
📅
Dispatch Scheduled by Rhea Berry
Scheduled For: 2026-07-22T15:30:00.000+0000
🗓️
Status: Scheduled by Rhea Berry
From: Assigned
To: Scheduled
Duration in Previous: 2m
2.0 business days
⏱️
2 3x Labor Added Jul 22, 12:44 PM
3x Labor Added → Status: Completed
✔️
Status: Completed by Eric Alesi
From: Scheduled, Completed
To: Completed, Closed
Duration in Previous: 1d 0h, 0m
📄
Status: Ready to Bill by Timothy Amburgey Jul 22, 12:56 PM
From: Closed
To: Ready to Bill
Duration in Previous: 9m
⚠️ 9.0 business days
📨
Status: Invoice Pending by Hannah Shaw Aug 3, 2:22 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 12d 1h
🧾
2 Invoice Created Aug 3, 2:29 PM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 7m

Bottlenecks

Scheduled
Duration: 6.0 business days (threshold: 2.0 business days)
Exceeded by 4.0 business days
Scheduled
Duration: 3.4 business days (threshold: 2.0 business days)
Exceeded by 1.4 business days
Ready to Bill
Duration: 8.9 business days (threshold: 1.0 business days)
Exceeded by 7.9 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
ERLA - PROD
Technician
Eric Alesi
Scheduled
Jul 22, 11:30 AM
Created
Jan 2, 3:16 PM
Invoice #
SM-269183

Work Details (3)

Name Type Status Qty Amount Date
WL-03302789 Labor Open 0.46666666666667 $0.00 Jul 22, 12:44 PM
WL-03302790 Labor Open 0.71666666666667 $194.25 Jul 22, 12:44 PM
WL-03302791 Travel Open 17 $0.00 Jul 22, 12:44 PM

Details