📍 CVS - CVS-00619 — 1150 Saratoga Street, East Boston MA, 02128
Jan 2, 2025 → Oct 5, 2026
🔴 Behind
PSM
SLA Clock
Last business day of January 2025 · Target: Jan 31, 2025
✗ SLA Missed (237 biz days late)
Active: 258 biz days
Paused: 181 biz days
🕐 Clock stopped: Completed (Oct 5, 2026)
236d
▶ Clock Running
Status: Created
Jan 2 → Dec 12, 2025
236 business days (counted)
Running total: 236 of ? biz days used
⏸181d
⏸ Clock Paused
Status: Ready for Release
Dec 12 → Sep 2, 2026
181 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Sep 2 → Sep 15, 2026
8 business days (counted)
Running total: 244 of ? biz days used
▶ Clock Running
Status: Assigned
Sep 15 → Sep 15, 2026
0 business days (counted)
Running total: 244 of ? biz days used
▶ Clock Running
Status: Scheduled
Sep 15 → Oct 1, 2026
12 business days (counted)
Running total: 256 of ? biz days used
▶ Clock Running
Status: Entered
Oct 1 → Oct 1, 2026
0 business days (counted)
Running total: 256 of ? biz days used
▶ Clock Running
Status: Assigned
Oct 1 → Oct 1, 2026
0 business days (counted)
Running total: 256 of ? biz days used
▶ Clock Running
Status: Scheduled
Oct 1 → Oct 5, 2026
2 business days (counted)
Running total: 258 of ? biz days used
Created: Jan 2, 2025Completed: Oct 5, 2026
Show SLA Clock Detail (8 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 2 → Dec 12
Created
▶ Running
236
236
Dec 12 → Sep 2
Ready for Release
⏸ Paused
181
—
Sep 2 → Sep 15
Ready for Scheduling
▶ Running
8
244
Sep 15 → Sep 15
Assigned
▶ Running
0
244
Sep 15 → Oct 1
Scheduled
▶ Running
12
256
Oct 1 → Oct 1
Entered
▶ Running
0
256
Oct 1 → Oct 1
Assigned
▶ Running
0
256
Oct 1 → Oct 5
Scheduled
▶ Running
2
258
Holding418.2d (excluded)
Coordinators24.5d
✗ SLA Missed
Holding(excluded from total)
418.2 days
Coordinators
24.5 days
Over SLA
Created: Jan 2, 2025
Due: Dec 31, 2026 (70 days left)
📅
439.5 daysTotal Age
⏱️
236.5d in On HoldLongest Stage
🔄
6 transitionsStatus Changes
⚠️
19.5d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Behind Schedule - Needs Attention
Ready to Bill • 657 days old
🚨
Primary Delay236.5 days stuck in "On Hold"
⏱️
Total Delay19.5 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
236.5d
Ready for Release
181.7d
Ready for Scheduling
8.5d / 1.0d SLA
Scheduled
16.0d / 2.0d SLA
Closed
0.4d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Preventive Maintenance (PM) Completed
* Performed a comprehensive preventive maintenance inspection of the kiosk and verified overall operational condition.
* Conducted a complete functionality test to ensure all primary features and components were operating properly.
* Thoroughly cleaned and disinfected the kiosk using an appropriate disinfectant cleaner.
* Inspected and tested the blood pressure (BP) system for potential air leakage and verified proper operation of the over-pressure safety switch.
* Calibrated the unit as required to ensure accurate and reliable performance.
* Inspected the power cord and connection for signs of wear, damage, or other safety concerns.
* Inspected the plexiglass display panel and confirmed it was intact, secure, and free of cracks or damage.
* Verified that all displayed advertisements and promotional content were current and properly presented.
* Confirmed the kiosk was functioning properly and was ready for normal operation upon completion of PM.
🔍Technician Findings
Unit in service
⚠️Problem Description
Please Perform PM: PM Checklist can be found as a link in the work order under WO actions
If Kiosk is not on the Sales floor request to speak to a manager to find out if kiosk is being stored in the back room or if it was disposed. Offer to help bring the kiosk to the salesfloor or advise that EMSAR can replace a disposed kiosk. If store does not want to bring the kiosk out of storage or if kiosk was disposed, close out work order with Repair code '37 Store intervention required' and document who you spoke with and outcome of conversation. Labor line shall be a trip charge.
***Important: Please make sure to document if kiosk is disposed or in storage***
If kiosk fails a PM, checklist is still required to be completed. Please use Code 35 - Follow up needed and detail in the Tech Findings, Work Performed and Final condition the result and cause for a follow up. Close out the work order. Dispatch will create a follow up repair work order to send parts.
📄Description
Model 300 with Backboard
📅
WO-01233628 - Preventive Maintenance - DD: 12/31/2026 - - LC300-15 - East Boston - CVS - CVS-00619
Oct 5, 2026 10:00am – 11:00am
Work Order: WO-01233628
Account: CVS
Customer Case Number:
Location: CVS - CVS-00619
Address: 1150 Saratoga Street, East Boston, MA 02128
Manufacturer:
Model #: LC300-15
Serial #: 300-006918
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/Time: 2026-10-05 14:00:0