Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01281785 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 ROBERT WOOD JOHNSON UNIVERSITY HOSPITAL NEW BRUNSWICK — 1 ROBERT WOOD JOHNSON PL, NEW BRUNSWICK NJ, 08901

Jun 19, 2025 → Dec 17, 2025

✅ Completed
PC Per client agreement
Target: Jan 31, 2026
🕐 Clock stopped: Completed (Dec 17)
⏸ 132d excluded (parts wait + holding)
✓ SLA Met (45d early)
Dispatch 0.1d
Holding 98.6d (excluded)
Coordinators 34.0d
Field Work 0.6d
Billing 11.8d
✓ SLA Met
Dispatch
0.1 days
Holding (excluded from total)
98.6 days
Coordinators
34.0 days
Over SLA
Field Work
0.6 days
Billing
11.8 days
Over SLA
Created: Jun 19, 2025 Due: Jan 31, 2026 Completed: Dec 17, 2025 (45 days early)
📅
129.7 days Total Age
⏱️
95.6d in Ready for Release Longest Stage
🔄
11 transitions Status Changes
⚠️
42.0d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
6 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 329 days old
🚨
Primary Delay 95.6 days stuck in "Ready for Release"
⏱️
Total Delay 42.0 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.1d / 0.5d SLA
Ready for Release
95.6d
On Hold
3.0d
Ready for Scheduling
28.0d / 1.0d SLA
Assigned
0.0d / 0.5d SLA
Scheduled
6.0d / 2.0d SLA
Tech On Site
0.6d / 1.0d SLA
Closed
2.2d / 1.0d SLA
Ready to Bill
11.8d / 1.0d SLA
Billing Review
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

12/10/2025 Cever received email from Rowena.Lim@RWJBH.org confirming FSE onsite for Dec 17th at 1 p.m.

12/09/2025 Cever sent email to Lim, Rowena <Rowena.Lim@RWJBH.org> offering FSE for Dec 17th at 1 p.m.

12/02/2025 Brod - called 9735258410 to speak to Rowena, went to vm left message to have FSE onsite for Thursday 12/04. following up in email.


11/05/2025 RArnold - device located 10 Plum street 4th floor 


11/03/2025 MKlose rcvd email from Steve, Rowena Lim will be POC. he adv schedule the corrective action. Rowena.Lim@RWJBH.org


10/30/2025 Mklose rcvd email from Ali, sent PO # is RWJNB0000382441 to Steve.


10/30/2025 Mklose rcvd email from Ali Belyea, "I’ll ask GE if they can send the PO. I think we are safe to close this one out as a location unknown at this point."


10/30/2025 Mklose rcvd email from Steve, "Hello Megan, no, I do not have a location. There have been numerous inquiries on this unit.   Do you know who purchased the unit ?" Emailed Ally to see if she can get a PO for this unit. Emailed Steve back to let him I escalated his question and would reach out to him as soon as I heard from GE rep.


10/29/2025 Mklose emailed Steve asking for update on device POC


09/18/2025 RArnold- Called 732.937.8641 for Christopher Cover. He is not in today. I was told that I should contact the Imagining department. Stephen Kuczek. Sending email to him. 

Stephen.Kuczek@rwjbh.org



09/18/2025 RArnold- Called (732) 735-2870 for Christopher Cover. Left a message


07/22/2025 RArnold - Called (732) 735-2870 for Christopher Cover. Left a message. Sending email. 

christopher.cover@rwjbh.org

🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
🔍 Technician Findings
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
⚠️ Problem Description
FMI 78101C: Venue Fit Thermal Event due to battery Purpose: Each affected system will have a SW Version R3.4 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Fit Ultrasound
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Jun 19, 2:26 PM
Work Order: WO-01281785
Type: FCO
Priority: PC
Status: Ready for Release by Allison Belyea Jun 19, 3:13 PM
From: Entered
To: Ready for Release
Duration in Previous: 46m
🚨 96.0 business days
⏸️
Status: On Hold by Megan Klose Oct 30, 9:45 AM
From: Ready for Release
To: On Hold
Duration in Previous: 132d 18h
3.0 business days
📅
Status: Ready for Scheduling by Megan Klose Nov 3, 10:52 AM
From: On Hold
To: Ready for Scheduling
Duration in Previous: 4d 2h
🚨 28.0 business days
👷
4 Technician Assigned Dec 10, 9:32 AM
Technician Assigned → Status: Assigned → Status: Scheduled → Dispatch Scheduled
👷
Status: Assigned by Cristina Everetts
From: Ready for Scheduling
To: Assigned
Duration in Previous: 36d 22h
🗓️
Status: Scheduled by Cristina Everetts
From: Assigned
To: Scheduled
Duration in Previous: 1m
📅
Dispatch Scheduled by Cristina Everetts
Scheduled For: 2025-12-17T18:00:00.000+0000
⚠️ 6.0 business days
🔧
Status: Tech On Site by Philmon Mehari Dec 17, 12:25 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 2h
🔩
Parts Added Dec 17, 1:01 PM
Type: Parts
Status: Open
Qty: 1
⏱️
4x Labor Added Dec 17, 4:40 PM
Type: Labor, Travel, Expenses
Status: Open
Qty: 1.5, 12
✔️
Status: Completed by Philmon Mehari Dec 17, 5:02 PM
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 4h 37m, 1m
2.9 business days
⏱️
2 Labor Added Dec 19, 11:43 AM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 1d 18h
3.0 business days
💵
2 Status: Billing Review Dec 23, 11:51 AM
Status: Billing Review → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Billing Review
To: Ready to Bill
Duration in Previous: 1m
⚠️ 9.0 business days
📨
2 Status: Invoice Pending Jan 2, 4:44 PM
Status: Invoice Pending → Invoice Created
🧾
Invoice Created
Invoice Number: SM-250435

Bottlenecks

Ready for Scheduling
Duration: 28.0 business days (threshold: 1.0 business days)
Exceeded by 27.0 business days
Scheduled
Duration: 6.0 business days (threshold: 2.0 business days)
Exceeded by 4.0 business days
Closed
Duration: 2.2 business days (threshold: 1.0 business days)
Exceeded by 1.2 business days
Ready to Bill
Duration: 2.9 business days (threshold: 1.0 business days)
Exceeded by 1.9 business days
Ready to Bill
Duration: 8.9 business days (threshold: 1.0 business days)
Exceeded by 7.9 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
FCO
Branch
N/A
Technician
Philmon Mehari
Scheduled
Dec 17, 1:00 PM
Created
Jun 19, 2:26 PM
Invoice #
SM-250435

Work Details (6)

Name Type Status Qty Amount Date
WL-03040582 Parts Open 1 $0.00 Dec 17, 1:01 PM
WL-03040928 Labor Open 1.5 $100.00 Dec 17, 4:40 PM
WL-03040929 Labor Open 1 $100.00 Dec 17, 4:40 PM
WL-03040930 Travel Open 12 $0.00 Dec 17, 4:40 PM
WL-03040937 Expenses Open 1 $0.00 Dec 17, 4:40 PM
WL-03043364 Labor Open 0.016666666666667 $38.00 Dec 19, 11:43 AM