Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01282885 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 HARRINGTON MEM HOSPITAL/VHA — 100 SOUTH ST, SOUTHBRIDGE MA, 01550

Jun 19, 2025 → Feb 16, 2026

✅ Completed
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✗ SLA Missed
Active: 18 biz days
Paused: 144 biz days
🕐 Clock stopped: Completed (Feb 16, 2026)
▶ Clock Running
Status: Created
Jun 19 → Jun 19, 2025
0 business days (counted)
Running total: 0 of ? biz days used
⏸144d
⏸ Clock Paused
Status: Ready for Release
Jun 19 → Jan 20, 2026
144 business days (not counted)
18d
▶ Clock Running
Status: Ready for Scheduling
Jan 20 → Feb 13, 2026
18 business days (counted)
Running total: 18 of ? biz days used
▶ Clock Running
Status: Scheduled
Feb 13 → Feb 16, 2026
0 business days (counted)
Running total: 18 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 16 → Feb 16, 2026
0 business days (counted)
Running total: 18 of ? biz days used
Created: Jun 19, 2025 Completed: Feb 16, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Jun 19 → Jun 19 Created ▶ Running 0 0
Jun 19 → Jan 20 Ready for Release ⏸ Paused 144
Jan 20 → Feb 13 Ready for Scheduling ▶ Running 18 18
Feb 13 → Feb 16 Scheduled ▶ Running 0 18
Feb 16 → Feb 16 Tech On Site ▶ Running 0 18
Holding 144.0d (excluded)
Coordinators 19.5d
Billing 8.2d
✗ SLA Missed
Holding (excluded from total)
144.0 days
Coordinators
19.5 days
Over SLA
Billing
8.2 days
Over SLA
Created: Jun 19, 2025 Due: Jan 31, 2026 Completed: Feb 16, 2026 (15 days late)
📅
162.0 days Total Age
⏱️
144.0d in Ready for Release Longest Stage
🔄
8 transitions Status Changes
⚠️
29.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
4 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 420 days old
🚨
Primary Delay 144.0 days stuck in "Ready for Release"
⏱️
Total Delay 29.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Release
144.0d
Ready for Scheduling
19.0d / 1.0d SLA
Scheduled
0.5d / 2.0d SLA
Tech On Site
0.0d / 1.0d SLA
Closed
6.0d / 1.0d SLA
Ready to Bill
7.8d / 1.0d SLA
Invoice Pending
0.3d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

02/13/2026 Mklose dispatch to April Feb 16th, unannounced.

01/20/2026 MHamersley - recd email reply from Melvin Vazquez, Unit Director, confirming device at Harrington Hospital in the Operating Department, specifically in the Anesthesia Workroom. I’ve included two technicians who cover that hospital and can be reached at the following numbers:

Chris Chenier: 508-817-6399

Timothy O’Hare: 774-436-0870


12/26/2025 Rbailey - Rcvd email from Melvin confirming this device is at Harrington specifically in the Anesthesia Workroom and included the contacts Chris Chenier: 508-817-6399 & Timothy O’Hare: 774-436-0870


12/26/2025 Rbailey - Called 508.765.9771 Xfer'd to BioMed. Spoke with Melvin Vazquez 978.460.8408

melvin.vazquez@intelashealth.com


12/24/2025 Rbailey - Called 508.765.9771 Xfer'd to Clinical Engineering. Call kept rolling finally system apologized and advised they were having technical difficulties

🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R4.4.3 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”"
🔍 Technician Findings
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R4.4.3 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”"
⚠️ Problem Description
FMI 78101D: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R4.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 ? OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Go Ultrasound
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Jun 19, 2:28 PM
Work Order: WO-01282885
Type: FCO
Priority: PC
Status: Ready for Release by Allison Belyea Jun 19, 3:16 PM
From: Entered
To: Ready for Release
Duration in Previous: 47m
🚨 144.0 business days
📅
Status: Ready for Scheduling by Mary Hamersley Jan 20, 11:04 AM
From: Ready for Release
To: Ready for Scheduling
Duration in Previous: 214d 20h
🚨 19.0 business days
👷
3 Technician Assigned Feb 13, 2:38 PM
Technician Assigned → Dispatch Scheduled → Status: Scheduled
📅
Dispatch Scheduled by Megan Klose
Scheduled For: 2026-02-16T13:00:00.000+0000
🗓️
Status: Scheduled by Megan Klose
From: Ready for Scheduling
To: Scheduled
Duration in Previous: 24d 3h
1.0 business days
🔧
2 Status: Tech On Site Feb 16, 2:54 PM
Status: Tech On Site → 3x Labor Added
⏱️
3x Labor Added
Type: Labor, Travel
Status: Open
Qty: 1.25, 1.5, 57
✔️
Status: Completed by April Nuovo Feb 16, 5:53 PM
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 2h 59m, 0m
⚠️ 6.0 business days
⏱️
2 Labor Added Feb 24, 12:19 PM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 7d 18h
⚠️ 8.0 business days
📨
Status: Invoice Pending by Timothy Amburgey Mar 5, 8:37 AM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 8d 20h
🧾
2 Invoice Created Mar 5, 11:12 AM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Timothy Amburgey
From: Invoice Pending
To: Invoiced
Duration in Previous: 2h 35m

Bottlenecks

Ready for Scheduling
Duration: 19.0 business days (threshold: 1.0 business days)
Exceeded by 18.0 business days
Closed
Duration: 6.0 business days (threshold: 1.0 business days)
Exceeded by 5.0 business days
Ready to Bill
Duration: 7.8 business days (threshold: 1.0 business days)
Exceeded by 6.8 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
FCO
Branch
N/A
Technician
April Nuovo
Scheduled
Feb 16, 8:00 AM
Created
Jun 19, 2:28 PM
Invoice #
SM-255626

Work Details (4)

Name Type Status Qty Amount Date
WL-03107371 Labor Open 1.25 $100.00 Feb 16, 2:56 PM
WL-03107372 Labor Open 1.5 $250.00 Feb 16, 2:56 PM
WL-03107373 Travel Open 57 $0.00 Feb 16, 2:56 PM
WL-03117632 Labor Open 0.016666666666667 $38.00 Feb 24, 12:19 PM

Details