Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01302412 ↗ ServiceMax

PHILIPS HEALTHCARE • PM • PC

📍 Tanner Medical Center Villa Rica — 601 Dallas Hwy, Villa Rica GA, 30180

Sep 5, 2025 → May 18, 2026

✅ Completed
PC
SLA Clock
Per client agreement · Target: Jun 30, 2026
✓ SLA Met (29 biz days early)
Active: 8 biz days
Paused: 165 biz days
🕐 Clock stopped: Completed (May 18, 2026)
▶ Clock Running
Status: Created
Sep 5 → Sep 5, 2025
0 business days (counted)
Running total: 0 of ? biz days used
⏸165d
⏸ Clock Paused
Status: Ready for Release
Sep 5 → May 6, 2026
165 business days (not counted)
▶ Clock Running
Status: Scheduled
May 6 → May 18, 2026
8 business days (counted)
Running total: 8 of ? biz days used
▶ Clock Running
Status: Tech On Site
May 18 → May 18, 2026
0 business days (counted)
Running total: 8 of ? biz days used
Created: Sep 5, 2025 Completed: May 18, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Sep 5 → Sep 5 Created ▶ Running 0 0
Sep 5 → May 6 Ready for Release ⏸ Paused 165
May 6 → May 18 Scheduled ▶ Running 8 8
May 18 → May 18 Tech On Site ▶ Running 0 8
Dispatch 0.0d
Holding 165.3d (excluded)
Coordinators 9.0d
Field Work 1.0d
Billing 1.3d
✓ SLA Met
Dispatch
0.0 days
Holding (excluded from total)
165.3 days
Coordinators
9.0 days
Over SLA
Field Work
1.0 days
Billing
1.3 days
Over SLA
Created: Sep 5, 2025 Due: Jun 30, 2026 Completed: May 18, 2026 (43 days early)
📅
173.4 days Total Age
⏱️
165.3d in Ready for Release Longest Stage
🔄
7 transitions Status Changes
⚠️
7.3d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
6 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 343 days old
🚨
Primary Delay 165.3 days stuck in "Ready for Release"
⏱️
Total Delay 7.3 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Release
165.3d
Scheduled
9.0d / 2.0d SLA
Tech On Site
1.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
07e-Partial Project
3.0d
Ready to Bill
1.3d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

05/06/2026 Rharris: Scheduled Bruce to be onsite 5/18 @ 12pm per email from Laurie Horton


05/05/2026 Rharris: Spoke to POC Laurie @ 770-812-8141. Resent email. Proposing Bruce May 18 for 2 devices at 2 locations. 04/24/2026 Rbailey - Called 770.812.5274 pressed Opt 3 Spoke with Lady who said to Email Laurie Horton. Sending email. Proposing May 18


02/26/2026 SRobinsonCalled Michael Bachelor, 770-812-9283. Spoke with Mike, he stated these should be for Laurie Horton to schedule, I advised that she stated these are not in her dept. He placed me on hold to see if he could get me a contact. Beth 770-812-5274 he asked me to try. Called 770-812-5274. Asked for Beth, she was OOO, asked for her email. Sending email to bcaldwell@tanner.org to see if she can confirm units.

02/18/2026 SRobinson- Sent Michael Bachelor an email to see if he can provide us with a good POC. 

02/16/2026 SRobinson- Per Laurie, "This equipment does not belong to the ultrasound department".

02/13/2026 SRobinson- Sent 1st attempt email to lhorton@tanner.org to try and confirm. 

🔧 Work Performed
Performed Annual PM as per Service Manual Instructions. All required PA results pass.
🔍 Technician Findings
Performed Annual PM as per Service Manual Instructions. All required PA results pass.
⚠️ Problem Description
EPIQ 7C Ultrasound System - IP 77065241 - SN US718B1329
📞 Call Description
PM - Contract - BG Required PM

Timeline

📋
Work Order Created Sep 5, 5:02 PM
Work Order: WO-01302412
Type: PM
Priority: PC
Status: Ready for Release by Mandy Newman Sep 5, 5:20 PM
From: Entered
To: Ready for Release
Duration in Previous: 18m
🚨 165.8 business days
👷
3 Technician Assigned May 6, 9:59 AM
Technician Assigned → Dispatch Scheduled → Status: Scheduled
📅
Dispatch Scheduled by Rhonda Harris
Scheduled For: 2026-05-18T16:00:00.000+0000
🗓️
Status: Scheduled by Rhonda Harris
From: Ready for Release
To: Scheduled
Duration in Previous: 242d 16h
⚠️ 9.0 business days
🔧
Status: Tech On Site by Bruce Ballard May 18, 12:13 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 12d 2h
⏱️
2 5x Labor Added May 18, 7:54 PM
5x Labor Added → Status: Completed
✔️
Status: Completed by Bruce Ballard
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 7h 41m, 0m
⏱️
2 Labor Added May 19, 9:24 AM
Labor Added → Status: 07e-Partial Project
📋
Status: 07e-Partial Project by Timothy Amburgey
From: Closed
To: 07e-Partial Project
Duration in Previous: 13h 33m
3.0 business days
📄
Status: Ready to Bill by Timothy Amburgey May 21, 5:42 PM
From: 07e-Partial Project
To: Ready to Bill
Duration in Previous: 2d 8h
💰
Status: Invoiced by Josh Longway May 22, 4:00 AM
From: Ready to Bill
To: Invoiced
Duration in Previous: 10h 17m

Bottlenecks

Scheduled
Duration: 9.0 business days (threshold: 2.0 business days)
Exceeded by 7.0 business days
Closed
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.1 business hours
Ready to Bill
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.3 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
PM
Branch
ERLA - PROD
Technician
Bruce Ballard
Scheduled
May 18, 12:00 PM
Created
Sep 5, 5:02 PM
Invoice #
N/A

Work Details (6)

Name Type Status Qty Amount Date
WL-03230751 Labor Open 1 $0.00 May 18, 7:54 PM
WL-03230752 Labor Open 2 $275.00 May 18, 7:54 PM
WL-03230753 Labor Open 1 $0.00 May 18, 7:54 PM
WL-03230754 Travel Open 29 $0.00 May 18, 7:54 PM
WL-03230755 Travel Open 28 $0.00 May 18, 7:54 PM
WL-03231105 Labor Open 0.016666666666667 $38.00 May 19, 9:24 AM

Details