Created: Dec 5, 2025
Due: Jun 30, 2026 (46 days left)
📅
56.0 daysTotal Age
⏱️
53.0d in EnteredLongest Stage
🔄
7 transitionsStatus Changes
⚠️
92.2d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
2 linesWork Details
🏠
2 visitsOn-Site Trips
📋
CoordinatorScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
Visit 1Feb 17, 2026
Visit 2Feb 18, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
Behind Schedule - Needs Attention
Incomplete • 161 days old
🚨
Primary Delay53.0 days stuck in "Entered"
⏱️
Total Delay92.2 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
53.0d / 0.5d SLA
Assigned
3.3d / 0.5d SLA
Completed
0.0d / 1.0d SLA
Closed
35.0d / 1.0d SLA
WO Correction Needed
1.7d
Billing Review
5.9d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
4/17/26 Ycampos - Placing WO in Incomplete per Fady.
4/10 DPatton - Duplicate JC2549-5405-006332 (same as wo 1322568) also tech has 2 "Upgrade" labor lines; is one supposed to be down time? Tech Closed w/o correcting.
2/26/26 DPatton - hi @Konstantin Barsky You have 2 (Upgrade) labor lines; is one of them supposed to be Down Time? Please correct or remove the additional labor line when you get a chance. Thank you!
🔧Work Performed
Installed/upgraded nosecone.
🔍Technician Findings
Nosecone upgrade needed.
⚠️Problem Description
GCX Advent 5G Nosecone Upgrade
📄Description
Jaco EVO Series Medical Carts
📞Call Description
GCX Advent 5G Nosecone Upgrade
Feb 26, 2026 12:02pm
hi @Konstantin Barsky You have 2 (Upgrade) labor lines; is one of them supposed to be Down Time? Please correct or remove the additional labor line when you get a chance. Thank you! @Douglas Pearce