Work Order 360 View
Detailed work order timeline, KPIs, and analysis
P5
5 business days from creation
Target:
Dec 17, 2025
🕐 Clock stopped: Completed (Dec 11)
✓ SLA Met (6d early)
Coordinators
1.7 days
Over SLA
Created: Dec 10, 2025
Due: Dec 17, 2025
Completed: Dec 11, 2025 (6 days early)
⏱️
1.8d in Closed
Longest Stage
🔄
7 transitions
Status Changes
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🚨
Primary Delay
1.8 days stuck in "Closed"
⏱️
Total Delay
2.0 business days over SLA thresholds
SLA vs Actual Time by Status
Ready for Scheduling
0.0d
/ 1.0d SLA
Tech On Site
0.0d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
0.2d
/ 1.0d SLA
💬 Activities, Notes & Communications
🔧
Work Performed
Removed footboard connector, reinstalled pin, reinstalled connector. Tested and observed proper operation.
🔍
Technician Findings
Pin in connector pushed out.
⚠️
Problem Description
Requested by GE: communication failure and knee section will not raise
📄
Description
Bed, Electric
Timeline
📋
📅
From:
Entered
To:
Ready for Scheduling
Duration in Previous:
0m
👷
👷
From:
Ready for Scheduling
To:
Assigned
Duration in Previous:
16m
🔧
⏱️
Type:
Labor
Status:
Open
Qty:
0.85, 2
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
5m
🏁
From:
Completed
To:
Closed
Duration in Previous:
4m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
22h 0m
📨
From:
Ready to Bill, Invoice Pending
To:
Invoice Pending, Invoiced
Duration in Previous:
1h 51m, 0m
🧾
Invoice Number:
SM-249021
Bottlenecks
Assigned
Duration: 1.7 business days (threshold: 4.0 business hours)
Exceeded by 1.2 business days
Closed
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.7 business hours
Work Details (2)
| Name |
Type |
Status |
Qty |
Amount |
Date |
| WL-03034121 |
Labor |
Open |
0.85 |
$0.00 |
Dec 11, 12:15 PM |
| WL-03034122 |
Labor |
Open |
2 |
$0.00 |
Dec 11, 12:15 PM |