Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01325255 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 AESTHETIC CLINIQUE — 2050 W COUNTY HIGHWAY 30A STE 114, SANTA ROSA BEACH FL, 32459

Dec 12, 2025 → Feb 18, 2026

🔴 Behind
PC Per client agreement
Target: Jan 31, 2026
🕐 Clock stopped: Completed (Feb 18)
⏸ 50d excluded (parts wait + holding)
✗ SLA Missed
Dispatch 2.0d
Holding 37.9d (excluded)
Coordinators 10.9d
Field Work 0.2d
Billing 56.4d
✗ SLA Missed
Dispatch
2.0 days
Over SLA
Holding (excluded from total)
37.9 days
Coordinators
10.9 days
Over SLA
Field Work
0.2 days
Billing
56.4 days
Over SLA
Created: Dec 12, 2025 Due: Jan 31, 2026 (104 days overdue)
📅
49.0 days Total Age
⏱️
37.9d in Ready for Release Longest Stage
🔄
11 transitions Status Changes
⚠️
31.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
7 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Behind Schedule - Needs Attention
Ready to Bill • 153 days old
🚨
Primary Delay 37.9 days stuck in "Ready for Release"
⏱️
Total Delay 31.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Ready for Release
37.9d
Scheduled
10.9d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
10.0d / 1.0d SLA
Ready to Bill
16.5d / 1.0d SLA
WO Correction Needed
39.9d

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

04/08/2026 ALuman - WO locked and FSE having difficulty closing

02/04/2026 ALuman - dispatch to Jared heisler to complete 2/18. Email confirmation sent to Aimee info@theclinique.net 

01/23/2026 YEspino Called 850-343-4194 to verify the device in question. Was able to speak to Sadie and she advised i needed to email her supervisor Aimee to be better assisted. Email: info@theclinique.net 


01/08/2026 YEspino Called 850-343-4194 to verify the device in question. Was just left on hold till the call was dropped.

🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: Completed FMI 78101 by installing SW Version R4.5 and communicated with customer to scrap previous software versions. Verification Test: Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
🔍 Technician Findings
"Template Name: Template Description: Problem Found: Action Taken: Completed FMI 78101 by installing SW Version R4.5 and communicated with customer to scrap previous software versions. Verification Test: Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
⚠️ Problem Description
FMI 78101E: Venue Fit Thermal Event due to battery Purpose: Each affected system will have a SW Version R4.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Fit Ultrasound
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Dec 12, 11:06 AM
Work Order: WO-01325255
Type: FCO
Priority: PC
2.0 business days
Status: Ready for Release by Mandy Newman Dec 15, 12:09 PM
From: Entered
To: Ready for Release
Duration in Previous: 3d 1h
🚨 38.0 business days
👷
3 Technician Assigned Feb 4, 11:50 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Ashley Luman
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 50d 23h, 0m
📅
Dispatch Scheduled by Ashley Luman
Scheduled For: 2026-02-18T13:00:00.000+0000
🚨 11.0 business days
🔧
Status: Tech On Site by Jared Heisler Feb 18, 8:32 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 13d 20h
🚗
2 2x Travel Added Feb 18, 10:04 AM
2x Travel Added → 4x Labor Added
⏱️
4x Labor Added
Type: Labor, Parts
Status: Open
Qty: 1.25, 1.5, 4.5
✔️
Status: Completed by Jared Heisler Feb 18, 10:10 AM
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 1h 38m, 0m
⚠️ 5.0 business days
⏱️
Labor Added Feb 24, 3:04 PM
Type: Labor
Status: Open
Qty: 0.016666666666667
📄
Status: Ready to Bill by Timothy Amburgey Feb 24, 3:10 PM
From: Closed
To: Ready to Bill
Duration in Previous: 6d 4h
⚠️ 7.0 business days
💵
Status: Billing Review by Timothy Amburgey Mar 4, 9:35 AM
From: Ready to Bill, Billing Review
To: Billing Review, WO Correction Needed
Duration in Previous: 7d 18h, 0m
⚠️ 5.0 business days
🏁
Status: Closed by Douglas Pearce Mar 10, 11:58 AM
From: WO Correction Needed
To: Closed
Duration in Previous: 6d 1h
2.0 business days
📄
Status: Ready to Bill by Timothy Amburgey Mar 11, 12:09 PM
From: Closed
To: Ready to Bill
Duration in Previous: 1d 0h
🚨 10.0 business days
💵
Status: Billing Review by Timothy Amburgey Mar 24, 12:34 PM
From: Ready to Bill, Billing Review
To: Billing Review, WO Correction Needed
Duration in Previous: 13d 0h, 0m
🚨 35.0 business days
🏁
Status: Closed by Sean Currie May 11, 10:48 AM
From: WO Correction Needed
To: Closed
Duration in Previous: 47d 22h
3.0 business days
📄
Status: Ready to Bill by Timothy Amburgey May 13, 9:24 AM
From: Closed
To: Ready to Bill
Duration in Previous: 1d 22h

Bottlenecks

Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 10.9 business days (threshold: 2.0 business days)
Exceeded by 8.9 business days
Closed
Duration: 5.0 business days (threshold: 1.0 business days)
Exceeded by 4.0 business days
Ready to Bill
Duration: 6.5 business days (threshold: 1.0 business days)
Exceeded by 5.5 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 10.0 business days (threshold: 1.0 business days)
Exceeded by 9.0 business days
Closed
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PC
Type
FCO
Branch
N/A
Technician
Jared Heisler
Scheduled
Feb 18, 8:00 AM
Created
Dec 12, 11:06 AM
Invoice #
N/A

Work Details (7)

Name Type Status Qty Amount Date
WL-03110011 Travel Open 40 $0.00 Feb 18, 10:04 AM
WL-03110012 Travel Open 272 $0.00 Feb 18, 10:04 AM
WL-03110014 Labor Open 1.25 $0.00 Feb 18, 10:06 AM
WL-03110015 Labor Open 1.5 $100.00 Feb 18, 10:06 AM
WL-03110016 Labor Open 4.5 $450.00 Feb 18, 10:06 AM
WL-03110021 Parts Open 1 $0.00 Feb 18, 10:07 AM
WL-03117982 Labor Open 0.016666666666667 $38.00 Feb 24, 3:04 PM

Details