📍 PALEY ORTHOPEDIC & SPINE INSTITUTE — 901 45TH ST, MANGONIA PARK FL, 33407
Dec 12, 2025 → Jan 28, 2026
✅ Completed
PCPer client agreement
Target:Jan 31, 2026
🕐 Clock stopped: Tech Off Site (Jan 9)
⏸ 17d excluded (parts wait + holding)
✓ SLA Met (22d early)
Dispatch2.0d
Material Management3.0d
Holding12.9d (excluded)
Coordinators6.0d
Field Work2.8d
Billing4.7d
✓ SLA Met
Dispatch
2.0 days
Over SLA
Material Management
3.0 days
Holding(excluded from total)
12.9 days
Coordinators
6.0 days
Over SLA
Field Work
2.8 days
Over SLA
Billing
4.7 days
Over SLA
Created: Dec 12, 2025
Due: Jan 31, 2026
Completed: Jan 28, 2026 (3 days early)
📅
34.0 daysTotal Age
⏱️
12.9d in Ready for ReleaseLongest Stage
🔄
12 transitionsStatus Changes
⚠️
21.8d overTotal Delay
📦
1 orders, 0 quotesParts & Quotes
📝
7 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 153 days old
🚨
Primary Delay12.9 days stuck in "Ready for Release"
⏱️
Total Delay21.8 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Ready for Release
12.9d
Scheduled
6.0d / 2.0d SLA
Awaiting Parts
3.0d / 3.0d SLA
Tech Off Site
0.8d / 2.0d SLA
Completed
2.0d / 1.0d SLA
Closed
14.8d / 1.0d SLA
Billing Review
0.0d / 2.0d SLA
Ready to Bill
3.5d / 1.0d SLA
Invoice Pending
1.1d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
12/31/2025 EMartin called (561) 844-5255 / transferred to front desk placed on hold spk with S.Mancino confirmed onsite for Thrs 01/08/26 smancino@paleyinstitute.org ext 293
12/29/2025 MHamersley - called 561-882-2725, no answer/unable to leave msg; sent f/u email: Ronald.Doropan@tenethealth.com
(we have another site scheduled for Jan 5 with same POC) ... 12/23/2025 Cever sent email to ronald.doropan@tenethealth.com trying to confirm inventory
🔧Work Performed
Template Name:
Template Description:
Problem Found:
Action Taken: “Completed FMI 78101 by installing SW Version R4.4.3 or R4.5 and communicated with customer to scrap previous software versions”.
Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed.
Equipment passed all required tests and has been returned to the customer fully functional”.
Template Name:
Template Description:
Problem Found:
Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by
customer and dispose of old batteries according to local regulation”.
Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”.
🔍Technician Findings
Template Name:
Template Description:
Problem Found:
Action Taken: “Completed FMI 78101 by installing SW Version R4.4.3 or R4.5 and communicated with customer to scrap previous software versions”.
Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed.
Equipment passed all required tests and has been returned to the customer fully functional”.
Template Name:
Template Description:
Problem Found:
Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by
customer and dispose of old batteries according to local regulation”.
Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”.
⚠️Problem Description
FMI 78101E: Venue Fit Thermal Event due to battery Purpose: Each affected system will have a SW Version R4.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📞Call Description
FMI 78101
📞
Live Call_No Answer Unable to Leave Message
Completed Dec 29, 2025
12/29/2025 MHamersley - called 561-882-2725, no answer/unable to leave msg.
📧
Email: Field Action Notice - FMI 78101 - GE Healthcare - Venue Go/Fit Thermal Event - PALEY ORTHOPEDIC & SPINE INSTITUTE - MANGONIA PARK, FL - WO-01325950
Completed Dec 23, 2025
To: ronald.doropan@tenethealth.com
CC: cristina.everetts@emsar.com; ashley.luman@emsar.com; central.scheduling@emsar.com
BCC: cristina.everetts@emsar.com
Attachment: Vendor Letter for Customers 78101 EMSAR.pdf, FMI 78101 Customer Letter_DOC3115777_Rev2.pdf
Subject: Field Action Notice - FMI 78101 - GE Healthcare - Venue Go/Fit Thermal Event - PALEY ORTHOPEDIC & SPINE INSTITUTE - MANGONIA PARK, FL - WO-01325950
Body:
Good morning,
I am contacting you on behalf of GE Healthcare about a Fiel
📅
WO-01325950 - FCO - MANGONIA PARK - PALEY ORTHOPEDIC & SPINE INSTITUTE
Jan 9, 2026 8:00am – 5:00pm
Work Order: WO-01325950
Account: GE Healthcare FMI
Customer Case Number: 1-554880491099, 1-554907963855
Location: PALEY ORTHOPEDIC & SPINE INSTITUTE
Address: 901 45TH ST, MANGONIA PARK, FL 33407
Manufacturer:
Model #:
Serial #: VFD000757
Contact Name:
Contact Phone:
Contact Email:
Due Date: 1/3
JPG
000757_Software Update
Jan 10, 2026
JPG
000757_Product Label Pic
Jan 10, 2026
Timeline
📋
Work Order Created Dec 12, 11:06 AM
Work Order:WO-01325950
Type:FCO
Priority:PC
⏳2.0 business days
✅
Status: Ready for Release by Mandy NewmanDec 15, 12:10 PM
From:Entered
To:Ready for Release
Duration in Previous:3d 1h
🚨13.0 business days
👷
▶
6
Technician Assigned Dec 31, 11:09 AM
Technician Assigned → Status: Scheduled → Dispatch Scheduled → Dispatch Scheduled → Parts Requested → Status: Awaiting Parts
🗓️
Status: Scheduled by Erin Martin
From:Ready for Release
To:Scheduled
Duration in Previous:15d 22h
📅
Dispatch Scheduled by Erin Martin
Scheduled For:2026-01-08T05:00:00.000+0000
📅
Dispatch Scheduled by Erin Martin
Scheduled For:2026-01-08T13:00:00.000+0000
📦
Parts Requested
Order:00087533
Status:Closed
📦
Status: Awaiting Parts by Erin Martin
From:Scheduled
To:Awaiting Parts
Duration in Previous:1m
⏳3.0 business days
🔩
▶
2
2x Parts Added Jan 2, 11:14 AM
2x Parts Added → Status: Scheduled
🗓️
Status: Scheduled by Sean Weaver
From:Awaiting Parts
To:Scheduled
Duration in Previous:2d 0h
⚠️6.0 business days
📅
▶
2
Dispatch Scheduled Jan 9, 12:24 PM
Dispatch Scheduled → Status: Tech On Site
🔧
Status: Tech On Site by Konstantin Barsky
From:Scheduled, Tech On Site
To:Tech On Site, Tech Off Site
Duration in Previous:7d 1h, 0m
⏳1.0 business days
⏱️
4x Labor Added Jan 10, 4:06 PM
Type:Labor, Travel
Status:Open
Qty:1, 10
✔️
Status: Completed by Konstantin BarskyJan 10, 4:58 PM
From:Tech Off Site
To:Completed
Duration in Previous:1d 4h
⏳2.0 business days
🏁
Status: Closed by Konstantin BarskyJan 13, 12:15 PM
From:Completed
To:Closed
Duration in Previous:2d 19h
🚨12.0 business days
💵
▶
2
Status: Billing Review Jan 28, 10:02 AM
Status: Billing Review → Status: Closed
🏁
Status: Closed by Timothy Amburgey
From:Billing Review
To:Closed
Duration in Previous:3m
⏳3.0 business days
⏱️
Labor Added Jan 30, 2:25 PM
Type:Labor
Status:Open
Qty:0.016666666666667
📄
Status: Ready to Bill by Timothy AmburgeyJan 30, 2:48 PM
From:Closed
To:Ready to Bill
Duration in Previous:2d 4h
⏳4.0 business days
📨
Status: Invoice Pending by Timothy AmburgeyFeb 4, 5:50 PM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:5d 3h
🧾
▶
2
Invoice Created Feb 5, 4:15 PM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Yecenia Campos
From:Invoice Pending
To:Invoiced
Duration in Previous:22h 25m
Bottlenecks
Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 6.0 business days (threshold: 2.0 business days)
Exceeded by 4.0 business days
Completed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 11.8 business days (threshold: 1.0 business days)
Exceeded by 10.8 business days
Closed
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days
Ready to Bill
Duration: 3.5 business days (threshold: 1.0 business days)