Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01326507 ↗ ServiceMax

GE HEALTHCARE • Repair • P5

📍 Lone Peak Hospital — 11900 S STATE ST, DRAPER UT, 84020

Dec 15, 2025 → Mar 10, 2026

✅ Completed
P5
SLA Clock
5 business days from creation · Target: Dec 22, 2025
✗ SLA Missed (44 biz days late)
Active: 49 biz days
Paused: 8 biz days
Budget: 5 biz days
🕐 Clock stopped: Completed (Mar 10, 2026)
SLA Target
▶ Clock Running
Status: Created
Dec 15 → Dec 15, 2025
0 business days (counted)
Running total: 0 of 5 biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 15 → Dec 15, 2025
0 business days (counted)
Running total: 0 of 5 biz days used
▶ Clock Running
Status: Assigned
Dec 15 → Dec 17, 2025
2 business days (counted)
Running total: 2 of 5 biz days used
11d
▶ Clock Running
Status: Scheduled
Dec 17 → Jan 5, 2026
11 business days (counted)
Running total: 13 of 5 biz days used
▶ Clock Running
Status: Entered
Jan 5 → Jan 5, 2026
0 business days (counted)
Running total: 13 of 5 biz days used
14d
▶ Clock Running
Status: Assigned
Jan 5 → Jan 26, 2026
14 business days (counted)
Running total: 27 of 5 biz days used
⏸8d
⏸ Clock Paused
Status: Awaiting Parts
Jan 26 → Feb 5, 2026
8 business days (not counted)
22d
▶ Clock Running
Status: Reschedule
Feb 5 → Mar 10, 2026
22 business days (counted)
Running total: 49 of 5 biz days used
Created: Dec 15, 2025 Completed: Mar 10, 2026
Business Days Used 49 / 5
0 5d budget +44d over
Show SLA Clock Detail (8 periods)
Period Status Clock Biz Days Running Total
Dec 15 → Dec 15 Created ▶ Running 0 0 / 5
Dec 15 → Dec 15 Ready for Scheduling ▶ Running 0 0 / 5
Dec 15 → Dec 17 Assigned ▶ Running 2 2 / 5
Dec 17 → Jan 5 Scheduled ▶ Running 11 13 / 5
Jan 5 → Jan 5 Entered ▶ Running 0 13 / 5
Jan 5 → Jan 26 Assigned ▶ Running 14 27 / 5
Jan 26 → Feb 5 Awaiting Parts ⏸ Paused 8
Feb 5 → Mar 10 Reschedule ▶ Running 22 49 / 5
Dispatch 0.0d
Material Management 8.1d
Coordinators 52.7d
Field Work 0.0d
Billing 0.0d
✗ SLA Missed
Dispatch
0.0 days
Material Management
8.1 days
Over SLA
Coordinators
52.7 days
Over SLA
Field Work
0.0 days
Billing
0.0 days
Created: Dec 15, 2025 Due: Dec 22, 2025 Completed: Mar 10, 2026 (77 days late)
📅
58.0 days Total Age
⏱️
23.0d in Reschedule Longest Stage
🔄
10 transitions Status Changes
⚠️
53.6d over Total Delay
📦
2 orders, 0 quotes Parts & Quotes
📝
8 lines Work Details
🏠
2 visits On-Site Trips
📋
Coordinator Scheduling
🔄
2 On-Site Visits (1 reschedule)
2 on-site visits — follow-up trip required
Visit 1 Jan 15, 2026
Visit 2 Mar 10, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 244 days old
🚨
Primary Delay 23.0 days stuck in "Reschedule"
⏱️
Total Delay 53.6 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.3d / 1.0d SLA
Assigned
17.7d / 0.5d SLA
Scheduled
11.7d / 2.0d SLA
Awaiting Parts
8.1d / 3.0d SLA
Reschedule
23.0d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

PO # 4010577765HTM

1/5/26 CDempsey- wo being transferred back to Nick's tech.

12/29/25 CDempsey- Tyler was not permitted into the facility due to credentialing.

12/17/25 CDempsey- Tyler Bollman flying to Utah. Will be onsite on Monday Dec 29th.

🔧 Work Performed
Connected all the leads to main board, then applied power to system. No sparks, burning, or short circuiting was detected. Performed a function test, and a scale weight test. All electrical systems are operational. The 1115 will need a new Power cable and 10 screws for the main board electrical box. Replaced power cable, reset retract mechanism, and replaced the screws
🔍 Technician Findings
Found 1115 big wheel stretcher with sheared off grounding pin on the electrical cord. The electrical box to the main board had also been unscrewed with the all the electrical connections unplugged.
⚠️ Problem Description
Damage to power cord. Scale inoperative. Ground pin to power cord missing.
📄 Description
Stryker 1115 Big Wheel Prime Series Stretcher

Timeline

📋
2 Work Order Created Dec 15, 8:29 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Sherry Reich
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
👷
2 Technician Assigned Dec 15, 10:41 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Michael Burris
From: Ready for Scheduling
To: Assigned
Duration in Previous: 2h 12m
3.0 business days
👷
Technician Assigned by Craig Dempsey Dec 17, 1:01 PM
Technician: Tyler Bollman
🗓️
2 Status: Scheduled Dec 17, 1:08 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Craig Dempsey
Scheduled For: 2025-12-29T17:00:00.000+0000
🚨 12.0 business days
🆕
2 Status: Entered Jan 5, 1:28 PM
Status: Entered → Technician Assigned
👷
Technician Assigned by Kaitlyn Kelch
Technician: Fernando Lemos
⚠️ 9.0 business days
⏱️
Labor Added Jan 15, 4:30 PM
Type: Labor
Status: Open
Qty: 1
⚠️ 6.9 business days
📦
2 Parts Requested Jan 26, 6:02 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Fernando Lemos
From: Assigned
To: Awaiting Parts
Duration in Previous: 21d 4h
📦
Parts Requested Jan 26, 6:09 PM
Order: 00089085
Status: Closed
⚠️ 8.7 business days
🔩
2x Parts Added Feb 5, 10:00 AM
Type: Parts, Expenses
Status: Open
Qty: 10
🔩
2 2x Parts Added Feb 5, 10:42 AM
2x Parts Added → Status: Reschedule
🔄
Status: Reschedule by Melissa Barrett
From: Awaiting Parts
To: Reschedule
Duration in Previous: 9d 16h
🚨 23.0 business days
⏱️
3 3x Labor Added Mar 10, 6:05 PM
3x Labor Added → Status: Completed → Status: Closed
✔️
Status: Completed by Fernando Lemos
From: Reschedule
To: Completed
Duration in Previous: 33d 6h
🏁
Status: Closed by Fernando Lemos
From: Completed
To: Closed
Duration in Previous: 1m
2.0 business days
📄
2 Status: Ready to Bill Mar 12, 2:20 AM
Status: Ready to Bill → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
🚨 82.0 business days
🧾
Invoice Created Jul 8, 5:02 PM
Invoice Number: SM-256262

Bottlenecks

Assigned
Duration: 3.0 business days (threshold: 4.0 business hours)
Exceeded by 2.5 business days
Scheduled
Duration: 11.7 business days (threshold: 2.0 business days)
Exceeded by 9.7 business days
Assigned
Duration: 14.7 business days (threshold: 4.0 business hours)
Exceeded by 14.2 business days
Awaiting Parts
Duration: 8.1 business days (threshold: 3.0 business days)
Exceeded by 5.1 business days
Reschedule
Duration: 23.0 business days (threshold: 2.0 business days)
Exceeded by 21.0 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

📦
Parts Order 00089083
Closed
📦
Parts Order 00089085
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P5
Type
Repair
Branch
N/A
Technician
Fernando Lemos
Scheduled
N/A
Created
Dec 15, 8:29 AM
Invoice #
SM-256262

Work Details (8)

Name Type Status Qty Amount Date
WL-03066789 Labor Open 1 $95.00 Jan 15, 4:30 PM
WL-03092729 Parts Open 10 $57.39 Feb 5, 10:00 AM
WL-03092730 Expenses Open 1 $0.00 Feb 5, 10:00 AM
WL-03092812 Parts Open 1 $186.14 Feb 5, 10:42 AM
WL-03092814 Expenses Open 1 $0.00 Feb 5, 10:42 AM
WL-03138057 Labor Open 2 $0.00 Mar 10, 6:05 PM
WL-03138058 Labor Open 2 $190.00 Mar 10, 6:05 PM
WL-03138059 Travel Open 64 $0.00 Mar 10, 6:05 PM

Details