4 business days from creation · Target: Dec 26, 2025
⚠ 159 biz days overdue
Active: 163 biz days
Budget: 4 biz days
SLA Target
▶ Clock Running
Status: Created
Dec 19 → Dec 19, 2025
0 business days (counted)
Running total: 0 of 4 biz days used
▶ Clock Running
Status: L2 Screening
Dec 19 → Dec 19, 2025
0 business days (counted)
Running total: 0 of 4 biz days used
163d
▶ Clock Running
Status: On Hold
Dec 19 → Aug 16, 2026
163 business days (counted)
Running total: 163 of 4 biz days used
Created: Dec 19, 2025Today
Business Days Used163 / 4
04d budget+159d over
Show SLA Clock Detail (3 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 19 → Dec 19
Created
▶ Running
0
0 / 4
Dec 19 → Dec 19
L2 Screening
▶ Running
0
0 / 4
Dec 19 → Aug 16
On Hold
▶ Running
163
163 / 4
Dispatch0.1d
⚠ Overdue
Dispatch
0.1 days
Created: Dec 19, 2025
Due: Dec 26, 2025 (233 days overdue)
📅
163.5 daysTotal Age
⏱️
0.0d in EnteredLongest Stage
🔄
2 transitionsStatus Changes
✅
On timeTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
0 linesWork Details
AI Analysis
Powered by OpenAI
Generating AI analysis...
On Track
On Hold • 239 days old
✅
No IssuesWork order progressed without significant delays
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
L2 Screening
0.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
12/19/25 lcoonrod
WO-01308893 was a repair/PM. We are OOS on top monitors. WO was changed to a PM (instead of separating the Repair and the PM into 2 WO). WO was marked for a follow up for the top monitor.
Original repair WO was entered on 10/10 with due date of 10/16.
⚠️Problem Description
Follow-Up Notes
new top monitor needed
Use this password to access the kiosk: J7N74MT2
If swapping out a PC, you would use: miker0me0g0lfech0
There is a mandatory 4 business day timeline in which to complete this work. If you have questions or require technical support during the service, call 931-284-4999 and follow the prompts to reach the EMSAR Level II Support team for assistance (Support Hours are Monday-Friday from 8:00 AM EST until 8:00 PM EST). Provide the team member with the Work Order number, location, and problem description. At the completion of the service contact the EMSAR Level II Support team so that they can remotely verify that the kiosk is online and operational.
**ALL NON-EMSAR TECHNICIANS: You must check in from the location as soon as you arrive onsite and before you begin working on the kiosk. Call 931-284-4999 and follow the prompts. If there are any questions about the service expectations, use this opportunity to ask the Level II Support team.**
📄Description
Merge KMY Kiosk
Dec 19, 2025 3:40pm
@Nicole Floyd WO-01308893 is marked as a follow up. It was a repair/PM. We are OOS on top monitors. WO was changed to a PM (instead of separating the Repair and the PM into 2 WO). WO was marked for a follow up for the top monitor.
Original repair WO was entered on 10/10 with due date of 10/16. I did this as a follow up, but this drops the location to the bottom of the list. Tech notes also state the PM failed due to the top monitor. Please let me know if you have any questions or if there is a way to get this location back into position where it will not be at the bottom of the list for top monitors.
SNOTE
follow up to WO-01308893
Dec 19, 2025
Timeline
📋
Work Order Created Dec 19, 3:23 PM
Work Order:WO-01327485
Type:Repair
Priority:P4
🔍
Status: L2 Screening by Leona CoonrodDec 19, 3:42 PM