Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01329296 ↗ ServiceMax

AGILENT TECHNOLOGIES (VPD) • Repair/PM • PSM

📍 Cinch Connectivity Solutions — 9100 Astin Dr Pharr, PHARR TX, 78577

Jan 5, 2026 → Apr 6, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (54 biz days late)
Active: 73 biz days
🕐 Clock stopped: Completed (Apr 20, 2026)
▶ Clock Running
Status: Created
Jan 5 → Jan 5, 2026
0 business days (counted)
Running total: 0 of ? biz days used
61d
▶ Clock Running
Status: Assigned
Jan 5 → Apr 2, 2026
61 business days (counted)
Running total: 61 of ? biz days used
12d
▶ Clock Running
Status: Tech On Site
Apr 2 → Apr 20, 2026
12 business days (counted)
Running total: 73 of ? biz days used
Created: Jan 5, 2026 Completed: Apr 20, 2026
Show SLA Clock Detail (3 periods)
Period Status Clock Biz Days Running Total
Jan 5 → Jan 5 Created ▶ Running 0 0
Jan 5 → Apr 2 Assigned ▶ Running 61 61
Apr 2 → Apr 20 Tech On Site ▶ Running 12 73
Dispatch 0.0d
Coordinators 62.0d
Field Work 13.0d
Billing 21.0d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
62.0 days
Over SLA
Field Work
13.0 days
Over SLA
Billing
21.0 days
Over SLA
Created: Jan 5, 2026 Due: Feb 5, 2026 Completed: Apr 6, 2026 (59 days late)
📅
64.0 days Total Age
⏱️
62.0d in Assigned Longest Stage
🔄
8 transitions Status Changes
⚠️
89.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
8 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 223 days old
🚨
Primary Delay 62.0 days stuck in "Assigned"
⏱️
Total Delay 89.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
62.0d / 0.5d SLA
Tech On Site
13.0d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
0.3d / 1.0d SLA
Billing Review
10.6d / 2.0d SLA
Ready to Bill
0.7d / 1.0d SLA
Invoice Pending
9.8d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
3/23/2026 Perform Bench Overhaul Warranty: Evaluation, unit has a bad turbo pump. Cleaned valve block, replaced all O-ring, plunger seal, internal calibrated leak, new HD ion source board, Cleaned inside spec-tube body, ion chamber, ion support pole, replace new filaments (2) unit failed to stay in -11 range. 4/2/2026 Replaced spec-tube (MY25350006) New filaments, pretested OK. Restarted. Perform fine test procedure, record parameter, chart record MDL/Helium Stability. Unit leak check ok shut off unit, drained oil from pump, pack up unit, ship it back to customer.
🔍 Technician Findings
Bad Turbo pump.
⚠️ Problem Description
Note 17.12.2025 09:55:43 NSICHANI 17.12.2025 02:55:37 UTC NSICHANI needs to be routed to Vacuum ____________________ Note 16.12.2025 16:24:57 WIGEORGE warr bench repair; turbo ____________________ Note 16.12.2025 16:21:29 WF-BATCH Agent: WIGEORGE Timestamp: 2025-12-16 16:21:19 Unit at Cinch Connectors in Reynosa, will ship to and from Cinch in Pharr, Texas Once the quotation has been accepted, please create a service order, and assign it to the service employee group 98004017 Trade services; if a "Request for RA" form is returned with the purchase order, please attach it to the notification e-mail. warranty; turbo
📄 Description
Wet, Helium LD MR15
📞 Call Description
VPD Bench Repair Warranty

Timeline

📋
3 Work Order Created Jan 5, 10:19 AM
Work Order Created → Status: Assigned → Technician Assigned
👷
Status: Assigned by Kim Pearson
From: Entered
To: Assigned
Duration in Previous: 1m
👷
Technician Assigned by Kim Pearson
Technician: Minh Huynh
🚨 62.0 business days
⏱️
3x Labor Added Apr 2, 10:05 AM
Type: Labor, Parts
Status: Open
Qty: 2, 1
🔧
Status: Tech On Site by Charles Sellon Apr 2, 10:14 AM
From: Assigned
To: Tech On Site
Duration in Previous: 86d 22h
⚠️ 9.0 business days
🔩
5x Parts Added Apr 14, 1:04 PM
Type: Parts
Status: Open
Qty: 1, 2
⚠️ 5.0 business days
✔️
Status: Completed by Minh Huynh Apr 20, 12:43 PM
From: Tech On Site
To: Completed
Duration in Previous: 18d 2h
🏁
Status: Closed by Minh Huynh Apr 20, 12:49 PM
From: Completed
To: Closed
Duration in Previous: 5m
💵
Status: Billing Review by Hannah Shaw Apr 20, 3:26 PM
From: Closed
To: Billing Review
Duration in Previous: 2h 37m
🚨 11.0 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARA May 4, 8:24 AM
From: Billing Review
To: Ready to Bill
Duration in Previous: 13d 16h
📨
Status: Invoice Pending by Hannah Shaw May 4, 1:58 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 5h 33m
🚨 10.0 business days
🧾
2 Invoice Created May 15, 4:17 PM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 11d 2h

Bottlenecks

Assigned
Duration: 62.0 business days (threshold: 4.0 business hours)
Exceeded by 61.5 business days
Tech On Site
Duration: 13.0 business days (threshold: 1.0 business days)
Exceeded by 12.0 business days
Billing Review
Duration: 10.6 business days (threshold: 2.0 business days)
Exceeded by 8.6 business days
Invoice Pending
Duration: 9.8 business days (threshold: 2.0 business days)
Exceeded by 7.8 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Repair/PM
Branch
ERLA - PROD
Technician
Minh Huynh
Scheduled
N/A
Created
Jan 5, 10:19 AM
Invoice #
SM-260950

Work Details (8)

Name Type Status Qty Amount Date
WL-03170243 Labor Open 2 $1,027.20 Apr 2, 10:05 AM
WL-03170245 Parts Open 1 $0.00 Apr 2, 10:05 AM
WL-03170246 Parts Open 1 $0.00 Apr 2, 10:05 AM
WL-03185279 Parts Open 1 $0.00 Apr 14, 1:04 PM
WL-03185280 Parts Open 1 $0.00 Apr 14, 1:04 PM
WL-03185281 Parts Open 2 $0.00 Apr 14, 1:04 PM
WL-03185282 Parts Open 1 $0.00 Apr 14, 1:04 PM
WL-03185283 Parts Open 1 $0.00 Apr 14, 1:04 PM

Details