📍 Renova Technology, Inc. — 1425 Oakbrook Drive Suite 600, Norcross GA, 30093
Jan 6, 2026 → May 15, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (14 biz days late)
Active: 31 biz days
Paused: 60 biz days
🕐 Clock stopped: Completed (May 16, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jan 16, 2026
7 business days (not counted)
25d
▶ Clock Running
Status: Assigned
Jan 16 → Feb 24, 2026
25 business days (counted)
Running total: 26 of ? biz days used
▶ Clock Running
Status: Entered
Feb 24 → Feb 24, 2026
0 business days (counted)
Running total: 26 of ? biz days used
⏸53d
⏸ Clock Paused
Status: Ready for Release
Feb 24 → May 8, 2026
53 business days (not counted)
▶ Clock Running
Status: Assigned
May 8 → May 8, 2026
0 business days (counted)
Running total: 26 of ? biz days used
▶ Clock Running
Status: Scheduled
May 8 → May 16, 2026
5 business days (counted)
Running total: 31 of ? biz days used
Created: Jan 6, 2026Completed: May 16, 2026
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jan 16
Ready for Release
⏸ Paused
7
—
Jan 16 → Feb 24
Assigned
▶ Running
25
26
Feb 24 → Feb 24
Entered
▶ Running
0
26
Feb 24 → May 8
Ready for Release
⏸ Paused
53
—
May 8 → May 8
Assigned
▶ Running
0
26
May 8 → May 16
Scheduled
▶ Running
5
31
Holding62.6d (excluded)
Coordinators30.6d
Billing0.2d
✗ SLA Missed
Holding(excluded from total)
62.6 days
Coordinators
30.6 days
Over SLA
Billing
0.2 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: May 16, 2026 (229 days early)
📅
91.6 daysTotal Age
⏱️
53.0d in Ready for ReleaseLongest Stage
🔄
7 transitionsStatus Changes
⚠️
28.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 221 days old
🚨
Primary Delay53.0 days stuck in "Ready for Release"
⏱️
Total Delay28.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
61.0d
Assigned
25.3d / 0.5d SLA
Scheduled
5.3d / 2.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.2d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Performed PM procedure
Vacuumed kiosk
Cleaned touchscreen
Calibrated touchscreen
BP test
Functional test
BP stop button working as expected
Seat lock working as expected
Seat lock release button working as expected
Levelers on floor
Set power on after power fail to power on in BIOS
Uploaded photos
🔍Technician Findings
Kiosk online
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
Work Order: WO-01329601
Account: HIGI LLC
Customer Case Number:
Location: Renova Technology, Inc.
Address: 1425 Oakbrook Drive Suite 600, Norcross, GA 30093
Manufacturer:
Model #: ZT2776-HW
Serial #: CSA-2014092631
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/