📍 Regal Marine Industries - One Digital — 2300 Jetport Drive, Orlando FL, 32809
Jan 6, 2026 → Mar 24, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 6 biz days
Paused: 47 biz days
🕐 Clock stopped: Completed (Mar 24, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸47d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Mar 17, 2026
47 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Mar 17 → Mar 17, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Assigned
Mar 17 → Mar 17, 2026
0 business days (counted)
Running total: 1 of ? biz days used
5d
▶ Clock Running
Status: Scheduled
Mar 17 → Mar 24, 2026
5 business days (counted)
Running total: 6 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 24 → Mar 24, 2026
0 business days (counted)
Running total: 6 of ? biz days used
Created: Jan 6, 2026Completed: Mar 24, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Mar 17
Ready for Release
⏸ Paused
47
—
Mar 17 → Mar 17
Ready for Scheduling
▶ Running
0
1
Mar 17 → Mar 17
Assigned
▶ Running
0
1
Mar 17 → Mar 24
Scheduled
▶ Running
5
6
Mar 24 → Mar 24
Tech On Site
▶ Running
0
6
Holding49.6d (excluded)
Coordinators5.9d
Field Work0.4d
Billing0.1d
✗ SLA Missed
Holding(excluded from total)
49.6 days
Coordinators
5.9 days
Over SLA
Field Work
0.4 days
Billing
0.1 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Mar 24, 2026 (282 days early)
📅
53.6 daysTotal Age
⏱️
48.0d in Ready for ReleaseLongest Stage
🔄
9 transitionsStatus Changes
⚠️
6.6d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
7 linesWork Details
🏠
2 visitsOn-Site Trips
👤
Self-ScheduledScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Robert Lewis — scheduling delays attributed to technician, not coordinators
Visit 1Mar 20, 2026
Visit 2Mar 24, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 222 days old
🚨
Primary Delay48.0 days stuck in "Ready for Release"
⏱️
Total Delay6.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
48.0d
Ready for Scheduling
0.3d / 1.0d SLA
Assigned
0.0d / 0.5d SLA
Scheduled
5.6d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.2d / 1.0d SLA
Closed
3.9d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/20/26 AJinerson - Tech went on-site as scheduled for today, 3/20 but site was already closed. This is in a cafeteria and they close on Fridays at 10:00 a.m. Security guard told tech that they will be open Mon. - Thurs. until around 2pm.
We will need to reschedule a return visit.
3/19/26 AJinerson - Tech would not get on-site until after 5pm, and from previous experience at this location, this unit is located in their cafeteria that closes at 2pm. Tech needs this rescheduled to first stop tomorrow morning to ensure site is open.
3/17/26 AJinerson - Sent chatter to tech regarding the below.
Per Higi, please send tech to site to attempt PM or to obtain a contact for scheduling. Scouting attempt will be treated as T&M unless we are allowed access then PM the unit.
🔧Work Performed
Completed Higi PM.
🔍Technician Findings
Kiosk was functioning normally.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Higi Station WI-FI
Mar 17, 2026 4:52pm
@Robert Lewis Hi Rob! We added this WO to Thursday, 3/19. Per internal notes, please go on-site to attempt a PM or to obtain a contact for this site for scheduling. This will be used as T&M unless they allow you to service the PM/Unit. Thanks! CC @Mark Franks
📅
WO-01329634 - Preventive Maintenance - DD: 12/31/2026 - - ZT2776-WIFI - Orlando - Regal Marine Industries - One Digital
Mar 24, 2026 9:00am – 10:00am
Work Order: WO-01329634
Account: HIGI LLC
Customer Case Number:
Location: Regal Marine Industries - One Digital
Address: 2300 Jetport Drive, Orlando, FL 32809
Manufacturer:
Model #: ZT2776-WIFI
Serial #: CSA-2016085484
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled D