📍 Waukegan Public Library — 128 N County St., Waukegan IL, 60085
Jan 6, 2026 → Apr 23, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 7 biz days
Paused: 68 biz days
🕐 Clock stopped: Completed (Apr 23, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸68d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 15, 2026
68 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 15 → Apr 15, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 15 → Apr 23, 2026
6 business days (counted)
Running total: 7 of ? biz days used
▶ Clock Running
Status: Tech On Site
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 7 of ? biz days used
Created: Jan 6, 2026Completed: Apr 23, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Apr 15
Ready for Release
⏸ Paused
68
—
Apr 15 → Apr 15
Assigned
▶ Running
0
1
Apr 15 → Apr 23
Scheduled
▶ Running
6
7
Apr 23 → Apr 23
Tech On Site
▶ Running
0
7
Holding70.6d (excluded)
Coordinators7.0d
Field Work0.5d
Billing0.1d
✗ SLA Missed
Holding(excluded from total)
70.6 days
Coordinators
7.0 days
Over SLA
Field Work
0.5 days
Billing
0.1 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Apr 24, 2026 (251 days early)
📅
75.6 daysTotal Age
⏱️
69.0d in Ready for ReleaseLongest Stage
🔄
7 transitionsStatus Changes
⚠️
5.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 222 days old
🚨
Primary Delay69.0 days stuck in "Ready for Release"
⏱️
Total Delay5.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
69.0d
Scheduled
7.0d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.4d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Tech performed a PM on the kiosk. After performing a PM on kiosk, tech function tested the unit and everything was found to be in working order. Tech let the librarian know that the kiosk was ready for use again.
🔍Technician Findings
Tech arrived on site and was told to perform a PM on the kiosk. Tech checked in the the librarian. Kiosk was found to be on and in working order and tech saw that all the lights were working on the seat and on the side. Both screens were on and working also.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Green Kiosk with a Wifi Installed and Storm Key pad
Work Order: WO-01329639
Account: HIGI LLC
Customer Case Number:
Location: Waukegan Public Library
Address: 128 N County St., Waukegan, IL 60085
Manufacturer: Higi
Model #: ZT2776-WIFI (Storm)
Serial #: Q9061-23010008
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date