📍 Sam's Club #8153 — 7970 N Mesa St, El Paso TX, 79932
Jan 6, 2026 → Jul 23, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 8 biz days
Paused: 130 biz days
🕐 Clock stopped: Tech Off Site (Jul 24, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸130d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jul 15, 2026
130 business days (not counted)
▶ Clock Running
Status: Assigned
Jul 15 → Jul 15, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Jul 15 → Jul 24, 2026
7 business days (counted)
Running total: 8 of ? biz days used
Created: Jan 6, 2026Tech Off Site: Jul 24, 2026
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jul 15
Ready for Release
⏸ Paused
130
—
Jul 15 → Jul 15
Assigned
▶ Running
0
1
Jul 15 → Jul 24
Scheduled
▶ Running
7
8
Holding132.6d (excluded)
Coordinators7.0d
Billing8.3d
✗ SLA Missed
Holding(excluded from total)
132.6 days
Coordinators
7.0 days
Over SLA
Billing
8.3 days
Over SLA
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Jul 24, 2026 (160 days early)
📅
137.9 daysTotal Age
⏱️
131.0d in Ready for ReleaseLongest Stage
🔄
8 transitionsStatus Changes
⚠️
11.8d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 220 days old
🚨
Primary Delay131.0 days stuck in "Ready for Release"
⏱️
Total Delay11.8 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
131.0d
Scheduled
7.0d / 2.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
8.3d / 1.0d SLA
Billing Review
0.0d / 2.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
7/23/26 CDempsey- Anthony contacted me last night to advise that he wouldn't have time to complete as scheduled due to delays. I have rescheduled it for today after HCP inspection on way back to hotel.
🔧Work Performed
PM unit fount that the seat and tower lights are out. The sound of the unit was not working, but with further inspection the sound plug was disconnect. Reconnected the cord and retested the unit. No other issues where found.
🔍Technician Findings
Unit seat and tower light are non functional.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Green Kiosk with 4G installed
📅
WO-01329702 - Preventive Maintenance - DD: 12/31/2026 - - ZT2776-4G - El Paso - Sam's Club #8153
Jul 23, 2026 5:30pm – 6:00pm
Work Order: WO-01329702
Account: HIGI LLC
Customer Case Number:
Location: Sam's Club #8153
Address: 7970 N Mesa St, El Paso, TX 79932
Manufacturer: Higi
Model #: ZT2776-4G
Serial #: CSA-2016105920
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/Time: 2026-07-23 20