📍 Publix 724 — 1001 Ponce De Leon, Atlanta GA, 30306
Jan 6, 2026 → Jan 19, 2026
✅ Completed
PSMLast business day of January 2026
Target:Jan 30, 2026
🕐 Clock stopped: Completed (Jan 19)
⏸ 1d excluded (parts wait + holding)
✓ SLA Met (10d early)
Holding3.6d (excluded)
Coordinators7.9d
Field Work1.3d
Billing0.0d
✓ SLA Met
Holding(excluded from total)
3.6 days
Coordinators
7.9 days
Over SLA
Field Work
1.3 days
Over SLA
Billing
0.0 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Jan 20, 2026 (345 days early)
📅
10.1 daysTotal Age
⏱️
7.9d in ScheduledLongest Stage
🔄
8 transitionsStatus Changes
⚠️
6.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 128 days old
🚨
Primary Delay7.9 days stuck in "Scheduled"
⏱️
Total Delay6.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
2.0d
Assigned
0.0d / 0.5d SLA
Scheduled
7.9d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
1.2d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
1/19/2026jsells sent chatter, noticed this shows cuff operation, and this is a PM, no sound?,
🔧Work Performed
Performed PM procedure
Vacuumed kiosk
Cleaned touchscreen
Calibrated touchscreen
BP test
Functional test
BP stop button working as expected
Seat lock working as expected
Seat lock release button working as expected
Levelers on floor
Set power on after power fail to power on in BIOS
Uploaded photos
No sound from speakers
Speakers working as clicks emit when phono jack is grounded
Adjusted level for speakers in control panel
speakers working as expected
🔍Technician Findings
Kiosk online
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Higi Station with 3G installed
Jan 19, 2026 3:03pm
@Cynthia Deville @Abby Jinerson @Nicole Floyd I noticed this was changed from a pm to cuff operation, does anything need to be done with the no sound , I do see where the plexi glass needs to be replaced
Work Order: WO-01329752
Account: HIGI LLC
Customer Case Number:
Location: Publix 724
Address: 1001 Ponce De Leon, Atlanta, GA 30306
Manufacturer:
Model #: ZT2776-3G
Serial #: CSA-2013040026
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/Time: 2026-01