📍 Sam's Club #4830 — 1459 N DYSART RD, Avondale AZ, 85323
Jan 6, 2026 → Mar 11, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (21 biz days late)
Active: 39 biz days
Paused: 5 biz days
🕐 Clock stopped: Completed (Mar 11, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸5d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jan 14, 2026
5 business days (not counted)
▶ Clock Running
Status: Assigned
Jan 14 → Jan 14, 2026
0 business days (counted)
Running total: 1 of ? biz days used
32d
▶ Clock Running
Status: Scheduled
Jan 14 → Mar 3, 2026
32 business days (counted)
Running total: 33 of ? biz days used
▶ Clock Running
Status: Reschedule
Mar 3 → Mar 4, 2026
1 business day (counted)
Running total: 34 of ? biz days used
▶ Clock Running
Status: Assigned
Mar 4 → Mar 4, 2026
0 business days (counted)
Running total: 34 of ? biz days used
5d
▶ Clock Running
Status: Scheduled
Mar 4 → Mar 11, 2026
5 business days (counted)
Running total: 39 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 11 → Mar 11, 2026
0 business days (counted)
Running total: 39 of ? biz days used
Created: Jan 6, 2026Completed: Mar 11, 2026
Show SLA Clock Detail (8 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jan 14
Ready for Release
⏸ Paused
5
—
Jan 14 → Jan 14
Assigned
▶ Running
0
1
Jan 14 → Mar 3
Scheduled
▶ Running
32
33
Mar 3 → Mar 4
Reschedule
▶ Running
1
34
Mar 4 → Mar 4
Assigned
▶ Running
0
34
Mar 4 → Mar 11
Scheduled
▶ Running
5
39
Mar 11 → Mar 11
Tech On Site
▶ Running
0
39
Holding7.6d (excluded)
Coordinators40.7d
Field Work0.2d
Billing0.0d
✗ SLA Missed
Holding(excluded from total)
7.6 days
Coordinators
40.7 days
Over SLA
Field Work
0.2 days
Billing
0.0 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Mar 11, 2026 (295 days early)
📅
44.6 daysTotal Age
⏱️
33.0d in ScheduledLongest Stage
🔄
8 transitionsStatus Changes
⚠️
35.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 220 days old
🚨
Primary Delay33.0 days stuck in "Scheduled"
⏱️
Total Delay35.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
6.0d
Scheduled
38.8d / 2.0d SLA
Reschedule
1.9d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
1.3d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Pm completed
🔍Technician Findings
Pm needed, kiosk was fully operational
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Higi Green Kiosk with 4G installed
Mar 12, 2026 11:12am
@Tyler Bollman please keep in mind these minor issues;
Tech Finding notes should be describing kiosk condition upon tech arrivalPlease choose Labor PM as the item line activity for PM workComments/Notes on the very bottom of PM checklist can't be blank.
I have been fixing them for you, please take time to see the correction above. Thank you