Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 3 biz days
Paused: 42 biz days
🕐 Clock stopped: Completed (Mar 12, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸42d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Mar 10, 2026
42 business days (not counted)
▶ Clock Running
Status: Assigned
Mar 10 → Mar 10, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Mar 10 → Mar 12, 2026
2 business days (counted)
Running total: 3 of ? biz days used
Created: Jan 6, 2026Completed: Mar 12, 2026
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Mar 10
Ready for Release
⏸ Paused
42
—
Mar 10 → Mar 10
Assigned
▶ Running
0
1
Mar 10 → Mar 12
Scheduled
▶ Running
2
3
Holding44.6d (excluded)
Coordinators2.5d
Billing0.3d
✗ SLA Missed
Holding(excluded from total)
44.6 days
Coordinators
2.5 days
Over SLA
Billing
0.3 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Mar 12, 2026 (294 days early)
📅
45.6 daysTotal Age
⏱️
43.0d in Ready for ReleaseLongest Stage
🔄
6 transitionsStatus Changes
⚠️
1.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay43.0 days stuck in "Ready for Release"
⏱️
Total Delay1.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
43.0d
Scheduled
2.5d / 2.0d SLA
Closed
1.7d / 1.0d SLA
Ready to Bill
0.2d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
On arrival, unit was up and running. LEDs were functioning. Seat lock functioning. Top and bottom screens illuminated and functioning. Performed and completed preventative maintenance procedures on this unit. Recalibrated weight on scale. Recalibrated touch screen. Verified BP pressure. Unit passes functional testing and has been returned to service.
🔍Technician Findings
On arrival, unit was up and running. LEDs were functioning. Seat lock functioning. Top and bottom screens illuminated and functioning. Performed and completed preventative maintenance procedures on this unit. Recalibrated weight on scale. Recalibrated touch screen. Verified BP pressure. Unit passes functional testing and has been returned to service.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
Work Order: WO-01329787
Account: HIGI LLC
Customer Case Number:
Location: Stop&Shop 563
Address: 5701 Sunrise Hwy, Holbrook, NY 11741
Manufacturer: Merge SH Holdings, Inc.
Model #: KMY8202F
Serial #: KMY-120630950-1050
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled D
JPG
IMG_20250109_122315592
Mar 12, 2026
JPG
IMG_20250214_113359001_HDR
Mar 12, 2026
PDF
chk list
Mar 12, 2026
JPG
IMG_20250109_122337898
Mar 12, 2026
JPG
IMG_20250109_122331609
Mar 12, 2026
PDF
WO-01329787_3-12-2026 6-46 PM
Mar 12, 2026
JPG
IMG_20250109_122153498
Mar 12, 2026
Timeline
📋
Work Order Created Jan 6, 2:13 PM
Work Order:WO-01329787
Type:Preventive Maintenance
Priority:PSM
✅
Status: Ready for Release by Stephanie RamenJan 7, 10:03 AM