📍 Pima County Administration East Building - AMS — 130 West Congress, Tucson AZ, 85701
Jan 6, 2026 → Present
🟢 On Track
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
0 biz days remaining
Active: 1 biz days
Paused: 152 biz days
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸152d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Aug 15, 2026
152 business days (not counted)
Created: Jan 6, 2026Today
Show SLA Clock Detail (2 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Aug 15
Ready for Release
⏸ Paused
152
—
Holding1.6d (excluded)
On Track
Holding(excluded from total)
1.6 days
Created: Jan 6, 2026
Due: Dec 31, 2026 (138 days left)
📅
153.6 daysTotal Age
⏱️
1.6d in On HoldLongest Stage
🔄
1 transitionsStatus Changes
✅
On timeTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
0 linesWork Details
AI Analysis
Powered by OpenAI
Generating AI analysis...
On Track
Ready for Release • 220 days old
🚨
Primary Delay1.6 days stuck in "On Hold"
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
💬 Activities, Notes & Communications
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Green Kiosk Hard wired
Timeline
📋
Work Order Created Jan 6, 2:13 PM
Work Order:WO-01329817
Type:Preventive Maintenance
Priority:PSM
✅
Status: Ready for Release by Stephanie RamenJan 7, 10:06 AM