📍 Dept Of Transportation - AMS — 1313 South Mission Road, Building 9 - Hallway near Room 101, Tucson AZ, 85713
Jan 6, 2026 → Sep 18, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 9 biz days
Paused: 168 biz days
🕐 Clock stopped: Completed (Sep 18, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸168d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Sep 8, 2026
168 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Sep 8 → Sep 16, 2026
6 business days (counted)
Running total: 7 of ? biz days used
▶ Clock Running
Status: Assigned
Sep 16 → Sep 16, 2026
0 business days (counted)
Running total: 7 of ? biz days used
▶ Clock Running
Status: Scheduled
Sep 16 → Sep 18, 2026
2 business days (counted)
Running total: 9 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 18 → Sep 18, 2026
0 business days (counted)
Running total: 9 of ? biz days used
Created: Jan 6, 2026Completed: Sep 18, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Sep 8
Ready for Release
⏸ Paused
168
—
Sep 8 → Sep 16
Ready for Scheduling
▶ Running
6
7
Sep 16 → Sep 16
Assigned
▶ Running
0
7
Sep 16 → Sep 18
Scheduled
▶ Running
2
9
Sep 18 → Sep 18
Tech On Site
▶ Running
0
9
Holding170.6d (excluded)
Coordinators9.2d
Field Work0.1d
Billing1.0d
✗ SLA Missed
Holding(excluded from total)
170.6 days
Coordinators
9.2 days
Over SLA
Field Work
0.1 days
Billing
1.0 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Sep 18, 2026 (104 days early)
📅
177.6 daysTotal Age
⏱️
169.0d in Ready for ReleaseLongest Stage
🔄
9 transitionsStatus Changes
⚠️
6.9d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 288 days old
🚨
Primary Delay169.0 days stuck in "Ready for Release"
⏱️
Total Delay6.9 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
169.0d
Ready for Scheduling
6.6d / 1.0d SLA
Scheduled
2.7d / 2.0d SLA
Tech On Site
0.0d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.7d / 1.0d SLA
Ready to Bill
1.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
9/8/26 MArnold- Called to confirm contact and equipment information.
Address Confirmed: 1313 S. Mission Rd., Bldg. 9
Unit on site: Yes
Unit located in a public place: Yes door bell
Scheduling ahead needed: Stop by
Certain day or time: 8am-5pm M-F
Confirmed contact: yes Cody Martin 520-724-2792
9/3/26 Marnold- LM to confirm the contact and equipment information. called 520-724-2792
9/3/26 Marnold- Called to confirm contact and equipment information. Veronica provided me with 520-724-2792
9/3/26 Marnold- LM to confirm the contact and equipment information.
Phone number was found in contacts under the location information. Called 520-724-8712.
🔧Work Performed
Pm completed
🔍Technician Findings
Pm needed
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Station Hardwired
📋
Outbound to +15207242792
Completed Sep 8, 2026
9/8/26 MArnold- Called to confirm contact and equipment information.
Address Confirmed: 1313 S. Mission Rd., Bldg. 9
Unit on site: Yes
Unit located in a public place: Yes door bell
Scheduling ahead needed: Stop by
Certain day or time: 8am-5pm M-F
Confirmed contact: yes Cody Martin 520-724-2792
📋
Outbound to +15207242792
Completed Sep 3, 2026
9/3/26 Marnold- LM to confirm the contact and equipment information.
📋
Outbound to +15207242651
Completed Sep 3, 2026
9/3/26 Marnold- Called to confirm contact and equipment information. Veronica provided me with 520-724-2792
Sep 8, 2026 3:32pm
@Nicole Floyd Per POC correct address is 1313 S. Mission Rd., Bldg. 9 Tucson AZ 85713. Can you please update the address. Thank you!