Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01329829 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Meijer #292 — 5800 WEST LAYTON, Greenfield WI, 53220

Jan 6, 2026 → Present

🟢 On Track
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
0 biz days remaining
Active: 4 biz days
Paused: 149 biz days
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸149d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Aug 11, 2026
149 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 11 → Aug 11, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Aug 11 → Aug 15, 2026
3 business days (counted)
Running total: 4 of ? biz days used
Created: Jan 6, 2026 Today
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Aug 11 Ready for Release ⏸ Paused 149
Aug 11 → Aug 11 Assigned ▶ Running 0 1
Aug 11 → Aug 15 Scheduled ▶ Running 3 4
Holding 151.6d (excluded)
On Track
Holding (excluded from total)
151.6 days
Created: Jan 6, 2026 Due: Dec 31, 2026 (138 days left)
📅
153.6 days Total Age
⏱️
150.0d in Ready for Release Longest Stage
🔄
2 transitions Status Changes
On time Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
0 lines Work Details
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
On Track
Scheduled • 220 days old
🚨
Primary Delay 150.0 days stuck in "Ready for Release"

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
150.0d

💬 Activities, Notes & Communications

⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄 Description
Higi Station Hardwired

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01329829
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 150.0 business days
👷
3 Technician Assigned Aug 11, 4:12 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Charles Ramen
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 216d 5h, 0m
📅
Dispatch Scheduled by Charles Ramen
Scheduled For: 2026-08-17T17:00:00.000+0000
4.0 business days
📅
2 Dispatch Scheduled Aug 14, 3:26 PM
Dispatch Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Charles Ramen
Scheduled For: 2026-08-17T18:30:00.000+0000

Bottlenecks

✅ No bottlenecks detected

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Scheduled
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Eric Alesi
Scheduled
Aug 17, 2:30 PM
Created
Jan 6, 2:13 PM
Invoice #
N/A

Details