Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 2 biz days
Paused: 42 biz days
🕐 Clock stopped: Completed (Mar 11, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸42d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Mar 10, 2026
42 business days (not counted)
▶ Clock Running
Status: Assigned
Mar 10 → Mar 10, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Mar 10 → Mar 11, 2026
1 business day (counted)
Running total: 2 of ? biz days used
Created: Jan 6, 2026Completed: Mar 11, 2026
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Mar 10
Ready for Release
⏸ Paused
42
—
Mar 10 → Mar 10
Assigned
▶ Running
0
1
Mar 10 → Mar 11
Scheduled
▶ Running
1
2
Holding44.6d (excluded)
Coordinators1.5d
Field Work0.0d
Billing0.1d
✗ SLA Missed
Holding(excluded from total)
44.6 days
Coordinators
1.5 days
Field Work
0.0 days
Billing
0.1 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Mar 11, 2026 (295 days early)
📅
44.6 daysTotal Age
⏱️
43.0d in Ready for ReleaseLongest Stage
🔄
6 transitionsStatus Changes
⚠️
0.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay43.0 days stuck in "Ready for Release"
⏱️
Total Delay0.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
43.0d
Scheduled
1.5d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.1d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
On arrival, unit was up and running. Seat lock functioning. All LEDs functioning. Top and bottom displays functioning. Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
🔍Technician Findings
On arrival, unit was up and running. Seat lock functioning. All LEDs functioning. Top and bottom displays functioning. Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
Work Order: WO-01329856
Account: HIGI LLC
Customer Case Number:
Location: Stop&Shop 2581
Address: 156-01 CROSSBAY BLVD, Howard Beach, NY 11414
Manufacturer:
Model #: ZT2776-WIFI
Serial #: CSA-2014124449
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/Time: 2026-0
JPG
IMG_20250113_125013002_HDR
Mar 11, 2026
PDF
chkl
Mar 11, 2026
JPG
IMG_20250113_125036317
Mar 11, 2026
PDF
WO-01329856_3-11-2026 7-19 PM
Mar 11, 2026
JPG
IMG_20250113_124839178
Mar 11, 2026
JPG
IMG_20250113_125003108
Mar 11, 2026
JPG
IMG_20250113_124955068
Mar 11, 2026
Timeline
📋
Work Order Created Jan 6, 2:13 PM
Work Order:WO-01329856
Type:Preventive Maintenance
Priority:PSM
✅
Status: Ready for Release by Stephanie RamenJan 7, 10:03 AM