WO-01329856 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Stop&Shop 2581 — 156-01 CROSSBAY BLVD, Howard Beach NY, 11414

Jan 6, 2026 → Mar 11, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 2 biz days
Paused: 42 biz days
🕐 Clock stopped: Completed (Mar 11, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸42d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Mar 10, 2026
42 business days (not counted)
▶ Clock Running
Status: Assigned
Mar 10 → Mar 10, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Mar 10 → Mar 11, 2026
1 business day (counted)
Running total: 2 of ? biz days used
Created: Jan 6, 2026 Completed: Mar 11, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Mar 10 Ready for Release ⏸ Paused 42
Mar 10 → Mar 10 Assigned ▶ Running 0 1
Mar 10 → Mar 11 Scheduled ▶ Running 1 2
Holding 44.6d (excluded)
Coordinators 1.5d
Field Work 0.0d
Billing 0.1d
✗ SLA Missed
Holding (excluded from total)
44.6 days
Coordinators
1.5 days
Field Work
0.0 days
Billing
0.1 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Mar 11, 2026 (295 days early)
📅
44.6 days Total Age
⏱️
43.0d in Ready for Release Longest Stage
🔄
6 transitions Status Changes
⚠️
0.1d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay 43.0 days stuck in "Ready for Release"
⏱️
Total Delay 0.1 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
43.0d
Scheduled
1.5d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.1d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
On arrival, unit was up and running. Seat lock functioning. All LEDs functioning. Top and bottom displays functioning. Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
🔍 Technician Findings
On arrival, unit was up and running. Seat lock functioning. All LEDs functioning. Top and bottom displays functioning. Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Station WI-FI

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01329856
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 50m
🚨 43.0 business days
👷
3 Status: Assigned Mar 10, 4:10 PM
Status: Assigned → Technician Assigned → Dispatch Scheduled
👷
Technician Assigned by Kourtney Smith
Technician: David Trost
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-03-11T17:30:00.000+0000
2.0 business days
⏱️
3 5x Labor Added Mar 11, 7:18 PM
5x Labor Added → Status: Completed → Status: Closed
✔️
Status: Completed by David Trost
From: Scheduled
To: Completed
Duration in Previous: 1d 3h
🏁
Status: Closed by David Trost
From: Completed
To: Closed
Duration in Previous: 3m
📄
Status: Ready to Bill by Hannah Shaw Mar 12, 10:37 AM
From: Closed
To: Ready to Bill
Duration in Previous: 15h 15m
📨
Status: Invoice Pending by Hannah Shaw Mar 12, 11:17 AM
From: Ready to Bill, Invoice Pending
To: Invoice Pending, Invoiced
Duration in Previous: 39m, 0m
3.0 business days
🧾
Invoice Created Mar 16, 8:51 PM
Invoice Number: SM-256285

Bottlenecks

Closed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.6 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
David Trost
Scheduled
Mar 11, 1:30 PM
Created
Jan 6, 2:13 PM
Invoice #
SM-256285

Work Details (5)

Name Type Status Qty Amount Date
WL-03140182 Labor Open 0.75 $0.00 Mar 11, 7:18 PM
WL-03140183 Labor Open 1 $0.00 Mar 11, 7:18 PM
WL-03140184 Labor Open 0.75 $0.00 Mar 11, 7:18 PM
WL-03140185 Travel Open 11 $0.00 Mar 11, 7:18 PM
WL-03140186 Travel Open 13 $0.00 Mar 11, 7:18 PM

Details