Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (57 biz days late)
Active: 75 biz days
Paused: 19 biz days
🕐 Clock stopped: Completed (May 20, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸19d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 4, 2026
19 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 4 → Feb 4, 2026
0 business days (counted)
Running total: 1 of ? biz days used
74d
▶ Clock Running
Status: Scheduled
Feb 4 → May 20, 2026
74 business days (counted)
Running total: 75 of ? biz days used
Created: Jan 6, 2026Completed: May 20, 2026
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Feb 4
Ready for Release
⏸ Paused
19
—
Feb 4 → Feb 4
Assigned
▶ Running
0
1
Feb 4 → May 20
Scheduled
▶ Running
74
75
Holding21.6d (excluded)
Coordinators74.3d
Field Work0.0d
Billing0.0d
✗ SLA Missed
Holding(excluded from total)
21.6 days
Coordinators
74.3 days
Over SLA
Field Work
0.0 days
Billing
0.0 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: May 20, 2026 (225 days early)
📅
93.9 daysTotal Age
⏱️
74.3d in ScheduledLongest Stage
🔄
7 transitionsStatus Changes
⚠️
72.3d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 220 days old
🚨
Primary Delay74.3 days stuck in "Scheduled"
⏱️
Total Delay72.3 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
20.0d
Assigned
0.0d / 0.5d SLA
Scheduled
74.3d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
**PM Failed due to bamboo seat covering completly missing as well as the 10 screws
**Lightly dusted inside and outside of higi
**Checked and calibrated audio & volume, BP, touch screen and weight bench.
**Wiped down higi with disinfectant cleaner
**Tested for functionality
**Completed full test successfully
**Verified/Changed BIOS setting to “POWER ON”
🔍Technician Findings
Unit in service
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf