Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 3 biz days
Paused: 85 biz days
🕐 Clock stopped: Completed (May 12, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸76d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 27, 2026
76 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 27 → Apr 27, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 27 → Apr 27, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Entered
Apr 27 → Apr 27, 2026
0 business days (counted)
Running total: 1 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Apr 27 → Apr 30, 2026
3 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 30 → Apr 30, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 30 → Apr 30, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Entered
Apr 30 → Apr 30, 2026
0 business days (counted)
Running total: 1 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Apr 30 → May 8, 2026
6 business days (not counted)
▶ Clock Running
Status: Assigned
May 8 → May 8, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
May 8 → May 12, 2026
2 business days (counted)
Running total: 3 of ? biz days used
Created: Jan 6, 2026Completed: May 12, 2026
Show SLA Clock Detail (12 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Apr 27
Ready for Release
⏸ Paused
76
—
Apr 27 → Apr 27
Assigned
▶ Running
0
1
Apr 27 → Apr 27
Scheduled
▶ Running
0
1
Apr 27 → Apr 27
Entered
▶ Running
0
1
Apr 27 → Apr 30
Ready for Release
⏸ Paused
3
—
Apr 30 → Apr 30
Assigned
▶ Running
0
1
Apr 30 → Apr 30
Scheduled
▶ Running
0
1
Apr 30 → Apr 30
Entered
▶ Running
0
1
Apr 30 → May 8
Ready for Release
⏸ Paused
6
—
May 8 → May 8
Assigned
▶ Running
0
1
May 8 → May 12
Scheduled
▶ Running
2
3
Holding89.0d (excluded)
Coordinators3.2d
Field Work0.0d
Billing2.0d
✗ SLA Missed
Holding(excluded from total)
89.0 days
Coordinators
3.2 days
Over SLA
Field Work
0.0 days
Billing
2.0 days
Over SLA
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: May 12, 2026 (233 days early)
📅
87.6 daysTotal Age
⏱️
77.0d in Ready for ReleaseLongest Stage
🔄
11 transitionsStatus Changes
⚠️
1.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay77.0 days stuck in "Ready for Release"
⏱️
Total Delay1.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
87.4d
Scheduled
3.2d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
On arrival, unit up and running. LEDs illuminated. Top and bottom displays illuminated. Seat lock functioning. Recalibrated touch screen.
Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
🔍Technician Findings
On arrival, unit up and running. LEDs illuminated. Top and bottom displays illuminated. Seat lock functioning. Recalibrated touch screen.
Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Green Kiosk with a Wifi Installed and Storm Key pad
Work Order: WO-01329895
Account: HIGI LLC
Customer Case Number:
Location: Stop&Shop 562
Address: 2350 North Ocean Avenue, Farmingville, NY 11738
Manufacturer: Higi
Model #: ZT2776-WIFI (Storm)
Serial #: CSA-2014051229
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Dat
JPG
IMG_20250114_110950347
May 11, 2026
PDF
chkl
May 11, 2026
PDF
WO-01329895_5-11-2026 8-18 PM
May 11, 2026
JPG
IMG_20250114_110944289
May 11, 2026
JPG
IMG_20250114_110958460
May 11, 2026
JPG
IMG_20250114_110602902_HDR
May 11, 2026
JPG
IMG_20250114_110932696
May 11, 2026
Timeline
📋
Work Order Created Jan 6, 2:13 PM
Work Order:WO-01329895
Type:Preventive Maintenance
Priority:PSM
✅
Status: Ready for Release by Stephanie RamenJan 7, 10:03 AM