Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01329906 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Stop&Shop 670 — 4531 North Main Street, Bridgeport CT, 06606

Jan 6, 2026 → Apr 28, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 3 biz days
Paused: 75 biz days
🕐 Clock stopped: Completed (Apr 28, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸75d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 24, 2026
75 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 24 → Apr 24, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 24 → Apr 28, 2026
2 business days (counted)
Running total: 3 of ? biz days used
Created: Jan 6, 2026 Completed: Apr 28, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Apr 24 Ready for Release ⏸ Paused 75
Apr 24 → Apr 24 Assigned ▶ Running 0 1
Apr 24 → Apr 28 Scheduled ▶ Running 2 3
Holding 77.6d (excluded)
Coordinators 3.0d
Billing 0.1d
✗ SLA Missed
Holding (excluded from total)
77.6 days
Coordinators
3.0 days
Over SLA
Billing
0.1 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Apr 28, 2026 (247 days early)
📅
78.6 days Total Age
⏱️
76.0d in Ready for Release Longest Stage
🔄
6 transitions Status Changes
⚠️
1.1d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay 76.0 days stuck in "Ready for Release"
⏱️
Total Delay 1.1 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
76.0d
Scheduled
3.0d / 2.0d SLA
Closed
1.1d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
Lightly dusted inside and outside, wipe down unit with disinfectant cleaner. Performed monitor calibration, weight and BP test, Kiosk functioning the way it should. The unit is functional and online.
🔍 Technician Findings
Upon arrival black screen on top monitor, but came back on after restart and functioning normally.
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄 Description
Merge KMY Kiosk

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01329906
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 50m
🚨 75.9 business days
👷
3 Technician Assigned Apr 24, 8:31 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kourtney Smith
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 106d 21h, 0m
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-04-28T14:00:00.000+0000
3.0 business days
⏱️
3x Labor Added Apr 28, 6:58 PM
Type: Labor, Travel
Status: Open
Qty: 2.75, 1, 81
✔️
Status: Completed by Curtis Allen Apr 28, 7:07 PM
From: Scheduled, Completed
To: Completed, Closed
Duration in Previous: 4d 10h, 0m
📄
Status: Ready to Bill by Hannah Shaw Apr 29, 2:32 PM
From: Closed
To: Ready to Bill
Duration in Previous: 19h 24m
📨
2 Status: Invoice Pending Apr 29, 3:40 PM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
3.0 business days
🧾
Invoice Created May 1, 8:55 PM
Invoice Number: SM-260445

Bottlenecks

Scheduled
Duration: 3.0 business days (threshold: 2.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.9 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Curtis Allen
Scheduled
Apr 28, 10:00 AM
Created
Jan 6, 2:13 PM
Invoice #
SM-260445

Work Details (3)

Name Type Status Qty Amount Date
WL-03204382 Labor Open 2.75 $0.00 Apr 28, 6:58 PM
WL-03204383 Labor Open 1 $0.00 Apr 28, 6:58 PM
WL-03204384 Travel Open 81 $0.00 Apr 28, 6:58 PM

Details