Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01329961 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Meijer #284 — 7701 Green Bay Rd, Kenosha WI, 53142

Jan 6, 2026 → Present

🟡 At Risk
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
0 biz days remaining
Active: 5 biz days
Paused: 148 biz days
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸72d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 21, 2026
72 business days (not counted)
▶ Clock Running
Status: Canceled
Apr 21 → Apr 22, 2026
1 business day (counted)
Running total: 2 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Apr 22 → Apr 22, 2026
0 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 22 → Apr 22, 2026
0 business days (counted)
Running total: 2 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 22 → Apr 27, 2026
3 business days (counted)
Running total: 5 of ? biz days used
▶ Clock Running
Status: Entered
Apr 27 → Apr 27, 2026
0 business days (counted)
Running total: 5 of ? biz days used
⏸76d
⏸ Clock Paused
Status: Ready for Release
Apr 27 → Aug 15, 2026
76 business days (not counted)
Created: Jan 6, 2026 Today
Show SLA Clock Detail (8 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Apr 21 Ready for Release ⏸ Paused 72
Apr 21 → Apr 22 Canceled ▶ Running 1 2
Apr 22 → Apr 22 Ready for Release ⏸ Paused 0
Apr 22 → Apr 22 Assigned ▶ Running 0 2
Apr 22 → Apr 27 Scheduled ▶ Running 3 5
Apr 27 → Apr 27 Entered ▶ Running 0 5
Apr 27 → Aug 15 Ready for Release ⏸ Paused 76
Holding 75.3d (excluded)
Coordinators 3.4d
On Track
Holding (excluded from total)
75.3 days
Coordinators
3.4 days
Over SLA
Created: Jan 6, 2026 Due: Dec 31, 2026 (138 days left)
📅
153.6 days Total Age
⏱️
73.0d in Ready for Release Longest Stage
🔄
6 transitions Status Changes
⚠️
1.4d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
0 lines Work Details

AI Analysis

Powered by OpenAI
Generating AI analysis...
On Track
Ready for Release • 220 days old
🚨
Primary Delay 73.0 days stuck in "Ready for Release"
⏱️
Total Delay 1.4 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
73.8d
Canceled
1.3d
Assigned
0.0d / 0.5d SLA
Scheduled
3.4d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
4/21/2026jsells cancel and adding to repair WO-01369781
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Station Hardwired

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01329961
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 73.0 business days
🚫
Status: Canceled by Jessica Sells Apr 21, 5:31 PM
From: Ready for Release
To: Canceled
Duration in Previous: 104d 6h
Status: Ready for Release by Jessica Foley Apr 22, 11:02 AM
From: Canceled
To: Ready for Release
Duration in Previous: 17h 31m
👷
2 Status: Assigned Apr 22, 5:02 PM
Status: Assigned → Technician Assigned
👷
Technician Assigned by Kaitlyn Kelch
Technician: Andrew Przybyla
🗓️
2 Status: Scheduled Apr 22, 5:09 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-05-01T20:00:00.000+0000
3.9 business days
🆕
Status: Entered by Kaitlyn Kelch Apr 27, 12:10 PM
From: Scheduled, Entered
To: Entered, Ready for Release
Duration in Previous: 4d 19h, 0m

Bottlenecks

Scheduled
Duration: 3.4 business days (threshold: 2.0 business days)
Exceeded by 1.4 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Ready for Release
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Unassigned
Scheduled
N/A
Created
Jan 6, 2:13 PM
Invoice #
N/A

Details