Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01329970 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Stop&Shop 2505 — 999 Montauk Hwy, Shirley NY, 11967

Jan 6, 2026 → Apr 8, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 2 biz days
Paused: 62 biz days
🕐 Clock stopped: Completed (Apr 8, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸62d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 7, 2026
62 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 7 → Apr 7, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 7 → Apr 8, 2026
1 business day (counted)
Running total: 2 of ? biz days used
Created: Jan 6, 2026 Completed: Apr 8, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Apr 7 Ready for Release ⏸ Paused 62
Apr 7 → Apr 7 Assigned ▶ Running 0 1
Apr 7 → Apr 8 Scheduled ▶ Running 1 2
Holding 64.6d (excluded)
Coordinators 2.0d
Field Work 0.0d
Billing 0.2d
✗ SLA Missed
Holding (excluded from total)
64.6 days
Coordinators
2.0 days
Field Work
0.0 days
Billing
0.2 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Apr 8, 2026 (267 days early)
📅
64.6 days Total Age
⏱️
63.0d in Ready for Release Longest Stage
🔄
7 transitions Status Changes
⚠️
1.3d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay 63.0 days stuck in "Ready for Release"
⏱️
Total Delay 1.3 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
63.0d
Scheduled
2.0d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.3d / 1.0d SLA
Ready to Bill
0.2d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
On arrival, unit was up and running. LEDs illuminated. Seat lock functioning. Top and bottom displays functioning and illuminated.  Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
🔍 Technician Findings
On arrival, unit was up and running. LEDs illuminated. Seat lock functioning. Top and bottom displays functioning and illuminated.  Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Green Kiosk with a Wifi Installed and Storm Key pad

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01329970
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 50m
🚨 63.0 business days
👷
3 Technician Assigned Apr 7, 8:58 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kourtney Smith
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 89d 21h, 0m
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-04-08T16:00:00.000+0000
2.0 business days
⏱️
2 5x Labor Added Apr 8, 5:14 PM
5x Labor Added → Status: Completed
✔️
Status: Completed by David Trost
From: Scheduled
To: Completed
Duration in Previous: 1d 8h
🏁
Status: Closed by David Trost Apr 8, 5:22 PM
From: Completed
To: Closed
Duration in Previous: 7m
2.8 business days
📄
Status: Ready to Bill by Hannah Shaw Apr 10, 3:46 PM
From: Closed
To: Ready to Bill
Duration in Previous: 1d 22h
📨
2 Status: Invoice Pending Apr 10, 5:04 PM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
🚨 10.9 business days
🧾
Invoice Created Apr 24, 3:40 PM
Invoice Number: SM-259027

Bottlenecks

Closed
Duration: 2.3 business days (threshold: 1.0 business days)
Exceeded by 1.3 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
David Trost
Scheduled
Apr 8, 12:00 PM
Created
Jan 6, 2:13 PM
Invoice #
SM-259027

Work Details (5)

Name Type Status Qty Amount Date
WL-03178300 Labor Open 0.5 $0.00 Apr 8, 5:14 PM
WL-03178301 Labor Open 1 $0.00 Apr 8, 5:14 PM
WL-03178302 Labor Open 1.75 $0.00 Apr 8, 5:14 PM
WL-03178303 Travel Open 8 $0.00 Apr 8, 5:14 PM
WL-03178304 Travel Open 65 $0.00 Apr 8, 5:14 PM

Details