Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01329973 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Shop Rite 330 — 214 Spencer Street, Manchester CT, 06040

Jan 6, 2026 → Feb 10, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 1 biz days
Paused: 23 biz days
🕐 Clock stopped: Canceled (Feb 10, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸23d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 10, 2026
23 business days (not counted)
Created: Jan 6, 2026 Canceled: Feb 10, 2026
Show SLA Clock Detail (2 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Feb 10 Ready for Release ⏸ Paused 23
Holding 25.6d (excluded)
✗ SLA Missed
Holding (excluded from total)
25.6 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Feb 10, 2026 (324 days early)
📅
24.6 days Total Age
⏱️
24.0d in Ready for Release Longest Stage
🔄
2 transitions Status Changes
On time Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
0 lines Work Details

AI Analysis

Powered by OpenAI
Generating AI analysis...
On Track
Canceled • 220 days old
🚨
Primary Delay 24.0 days stuck in "Ready for Release"

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
24.0d

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
2/10/26 SReich - Creating a repair/PM.
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Merge KMY Kiosk

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01329973
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 50m
🚨 24.0 business days
🚫
Status: Canceled by Sherry Reich Feb 10, 4:41 PM
From: Ready for Release
To: Canceled
Duration in Previous: 34d 6h

Bottlenecks

✅ No bottlenecks detected

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Canceled
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Unassigned
Scheduled
N/A
Created
Jan 6, 2:13 PM
Invoice #
N/A

Details