Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01330042 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Stop & Shop - STO-00689 — 318 West Middle Turnpike, Manchester CT, 06040

Jan 6, 2026 → May 8, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 3 biz days
Paused: 83 biz days
🕐 Clock stopped: Completed (May 8, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸83d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → May 6, 2026
83 business days (not counted)
▶ Clock Running
Status: Assigned
May 6 → May 6, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
May 6 → May 8, 2026
2 business days (counted)
Running total: 3 of ? biz days used
Created: Jan 6, 2026 Completed: May 8, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → May 6 Ready for Release ⏸ Paused 83
May 6 → May 6 Assigned ▶ Running 0 1
May 6 → May 8 Scheduled ▶ Running 2 3
Holding 85.6d (excluded)
Coordinators 3.0d
Field Work 0.1d
Billing 0.7d
✗ SLA Missed
Holding (excluded from total)
85.6 days
Coordinators
3.0 days
Over SLA
Field Work
0.1 days
Billing
0.7 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: May 8, 2026 (237 days early)
📅
86.6 days Total Age
⏱️
84.0d in Ready for Release Longest Stage
🔄
7 transitions Status Changes
⚠️
1.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay 84.0 days stuck in "Ready for Release"
⏱️
Total Delay 1.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
84.0d
Scheduled
3.0d / 2.0d SLA
Completed
0.1d / 1.0d SLA
Closed
1.8d / 1.0d SLA
Ready to Bill
0.7d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
** Sent email to dispatch requesting repair wo. I had fans on hand. **PM Completed. **Lightly dusted inside and outside of higi **Checked and calibrated audio & volume, BP, touch screen and weight bench. **Wiped down higi with disinfectant cleaner **Tested for functionality **Completed full test successfully **Verified/Changed BIOS setting to “POWER ON”
🔍 Technician Findings
Unit in service. **Found left side fan inoperative.
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄 Description
Merge KMY Kiosk

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01330042
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 84.0 business days
👷
3 Technician Assigned May 6, 10:39 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kourtney Smith
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 118d 23h, 0m
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-05-08T14:00:00.000+0000
3.0 business days
⏱️
3x Labor Added May 8, 12:17 PM
Type: Labor, Travel
Status: Open
Qty: 1.16667, 0.16667, 2
✔️
Status: Completed by Luis Torres May 8, 12:47 PM
From: Scheduled
To: Completed
Duration in Previous: 2d 2h
🏁
Status: Closed by Luis Torres May 8, 1:35 PM
From: Completed
To: Closed
Duration in Previous: 47m
2.0 business days
📄
Status: Ready to Bill by Hannah Shaw May 11, 11:54 AM
From: Closed
To: Ready to Bill
Duration in Previous: 2d 22h
📨
2 Status: Invoice Pending May 11, 5:10 PM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
🚨 24.9 business days
🧾
Invoice Created Jun 15, 2:49 PM
Invoice Number: SM-261664

Bottlenecks

Scheduled
Duration: 3.0 business days (threshold: 2.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.4 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Luis Torres
Scheduled
May 8, 10:00 AM
Created
Jan 6, 2:13 PM
Invoice #
SM-261664

Work Details (3)

Name Type Status Qty Amount Date
WL-03219651 Labor Open 1.16667 $0.00 May 8, 12:17 PM
WL-03219652 Labor Open 0.16667 $0.00 May 8, 12:17 PM
WL-03219653 Travel Open 2 $0.00 May 8, 12:17 PM

Details