📍 Sam's Club #4974 — 2650 E CRAIG RD, North Las Vegas NV, 89030
Jan 6, 2026 → Sep 22, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (6 biz days late)
Active: 24 biz days
Paused: 154 biz days
🕐 Clock stopped: Completed (Sep 21, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸154d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Aug 18, 2026
154 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 18 → Aug 18, 2026
0 business days (counted)
Running total: 1 of ? biz days used
16d
▶ Clock Running
Status: Scheduled
Aug 18 → Sep 10, 2026
16 business days (counted)
Running total: 17 of ? biz days used
▶ Clock Running
Status: Entered
Sep 10 → Sep 10, 2026
0 business days (counted)
Running total: 17 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 10 → Sep 11, 2026
1 business day (counted)
Running total: 18 of ? biz days used
▶ Clock Running
Status: Assigned
Sep 11 → Sep 11, 2026
0 business days (counted)
Running total: 18 of ? biz days used
▶ Clock Running
Status: Scheduled
Sep 11 → Sep 21, 2026
6 business days (counted)
Running total: 24 of ? biz days used
Created: Jan 6, 2026Completed: Sep 21, 2026
Show SLA Clock Detail (8 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Aug 18
Ready for Release
⏸ Paused
154
—
Aug 18 → Aug 18
Assigned
▶ Running
0
1
Aug 18 → Sep 10
Scheduled
▶ Running
16
17
Sep 10 → Sep 10
Entered
▶ Running
0
17
Sep 10 → Sep 11
Ready for Scheduling
▶ Running
1
18
Sep 11 → Sep 11
Assigned
▶ Running
0
18
Sep 11 → Sep 21
Scheduled
▶ Running
6
24
Holding156.6d (excluded)
Coordinators24.1d
Field Work2.0d
Billing0.7d
✗ SLA Missed
Holding(excluded from total)
156.6 days
Coordinators
24.1 days
Over SLA
Field Work
2.0 days
Over SLA
Billing
0.7 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Sep 22, 2026 (100 days early)
📅
179.6 daysTotal Age
⏱️
155.0d in Ready for ReleaseLongest Stage
🔄
9 transitionsStatus Changes
⚠️
20.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 289 days old
🚨
Primary Delay155.0 days stuck in "Ready for Release"
⏱️
Total Delay20.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
155.0d
Scheduled
22.6d / 2.0d SLA
Ready for Scheduling
1.4d / 1.0d SLA
Completed
2.0d / 1.0d SLA
Closed
0.3d / 1.0d SLA
Ready to Bill
0.7d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Disengaged seat lock to check full motion of seat and ensure locking mechanism worked. Proceeded to open tower, powered kiosk off and kiosk had plenty of space around so just checked leveling feet. Did a double cleaning of outside surface of unit by first removed all grime and gunk off of touchscreen as well as kiosk. Next sprayed with antibacterial to sanitize unit for my use and customer use. Next open the tower and began to vacuum all the dust that had accumulated. Once cleaning completed powered unit back on with combo cal tool and keyboard plugged in. Once powered on completed PM checklist requirement. Calibrated scale , touchscreen, ensure proper weight for scale and ran combo cal test with no issues. Unit closed back up and returned to service.
🔍Technician Findings
Kiosk Found powered on with no customer damage
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Green Kiosk with 4G installed
📅
WO-01330050 - Preventive Maintenance - DD: 12/31/2026 - - ZT2776-4G - North Las Vegas - Sam's Club #4974
Sep 17, 2026 12:00pm – 1:00pm
Work Order: WO-01330050
Account: HIGI LLC
Customer Case Number:
Location: Sam's Club #4974
Address: 2650 E CRAIG RD, North Las Vegas, NV 89030
Manufacturer: Higi
Model #: ZT2776-4G
Serial #: CSA-2016105523
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/Time: 2026