📍 Sam's Club #4709 — 1375 E ONTARIO AVE, Corona CA, 92881
Jan 6, 2026 → Sep 7, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (3 biz days late)
Active: 21 biz days
Paused: 146 biz days
🕐 Clock stopped: Completed (Sep 3, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸18d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 3, 2026
18 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 3 → Feb 3, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Feb 3 → Feb 13, 2026
8 business days (counted)
Running total: 9 of ? biz days used
▶ Clock Running
Status: Reschedule
Feb 13 → Feb 16, 2026
0 business days (counted)
Running total: 9 of ? biz days used
▶ Clock Running
Status: Entered
Feb 16 → Feb 16, 2026
0 business days (counted)
Running total: 9 of ? biz days used
⏸128d
⏸ Clock Paused
Status: Ready for Release
Feb 16 → Aug 18, 2026
128 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 18 → Aug 18, 2026
0 business days (counted)
Running total: 9 of ? biz days used
▶ Clock Running
Status: Scheduled
Aug 18 → Sep 1, 2026
10 business days (counted)
Running total: 19 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 1 → Sep 1, 2026
0 business days (counted)
Running total: 19 of ? biz days used
▶ Clock Running
Status: Tech Off Site
Sep 1 → Sep 2, 2026
1 business day (counted)
Running total: 20 of ? biz days used
▶ Clock Running
Status: Scheduled
Sep 2 → Sep 3, 2026
1 business day (counted)
Running total: 21 of ? biz days used
Created: Jan 6, 2026Completed: Sep 3, 2026
Show SLA Clock Detail (12 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Feb 3
Ready for Release
⏸ Paused
18
—
Feb 3 → Feb 3
Assigned
▶ Running
0
1
Feb 3 → Feb 13
Scheduled
▶ Running
8
9
Feb 13 → Feb 16
Reschedule
▶ Running
0
9
Feb 16 → Feb 16
Entered
▶ Running
0
9
Feb 16 → Aug 18
Ready for Release
⏸ Paused
128
—
Aug 18 → Aug 18
Assigned
▶ Running
0
9
Aug 18 → Sep 1
Scheduled
▶ Running
10
19
Sep 1 → Sep 1
Tech On Site
▶ Running
0
19
Sep 1 → Sep 2
Tech Off Site
▶ Running
1
20
Sep 2 → Sep 3
Scheduled
▶ Running
1
21
Holding148.6d (excluded)
Coordinators22.1d
Field Work3.3d
Billing0.1d
✗ SLA Missed
Holding(excluded from total)
148.6 days
Coordinators
22.1 days
Over SLA
Field Work
3.3 days
Over SLA
Billing
0.1 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Sep 7, 2026 (115 days early)
📅
168.6 daysTotal Age
⏱️
128.0d in Ready for ReleaseLongest Stage
🔄
12 transitionsStatus Changes
⚠️
17.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 288 days old
🚨
Primary Delay128.0 days stuck in "Ready for Release"
⏱️
Total Delay17.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
147.0d
Scheduled
21.1d / 2.0d SLA
Reschedule
1.0d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Tech Off Site
1.2d / 2.0d SLA
Completed
2.0d / 1.0d SLA
Closed
2.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2/15/26 RBerry- Technician unable to complete on scheduled date. Placing WO back into RFR.
🔧Work Performed
Found unit in pharmacy area - documented pictures of unit - inspected leveling feet which were found to not be set properly allowing the unit to be moved back and forth easily, set down leveling feet - unlocked seat and waited for it to lock in place, after locking, seat was still able to move freely, only locking once almost being closed - locking module may need to be replaced - performed a bp test successfully verifying stop button worked - powered off unit, note: power outlet providing power is damaged and exposed - vacuumed and wiped down unit exterior and interior - password not working, called level 2 support to gain new password - connected combined calibration tool and keyboard to POC - powered on unit - proceed to run combined calibration tool - calibration, transducer and pressure check passed- verified and calibrated weight scale - calibrated touch screen- completed checklist, cleaned up work site and checked out with site manager
🔍Technician Findings
Found unit in need of PM
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
Work Order: WO-01330206
Account: HIGI LLC
Customer Case Number:
Location: Sam's Club #4709
Address: 1375 E ONTARIO AVE, Corona, CA 92881
Manufacturer: Higi
Model #: ZT2776-4G
Serial #: CSA-2016014700
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/Time