Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01330266 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Meijer #DC93 — 2501 S Creyts Rd., Lansing MI, 48917

Jan 6, 2026 → Feb 20, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 1 biz days
Paused: 30 biz days
🕐 Clock stopped: Canceled (Feb 20, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸30d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 20, 2026
30 business days (not counted)
▶ Clock Running
Status: Entered
Feb 20 → Feb 20, 2026
0 business days (counted)
Running total: 1 of ? biz days used
Created: Jan 6, 2026 Canceled: Feb 20, 2026
Show SLA Clock Detail (3 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Feb 20 Ready for Release ⏸ Paused 30
Feb 20 → Feb 20 Entered ▶ Running 0 1
Dispatch 0.0d
Holding 32.6d (excluded)
✗ SLA Missed
Dispatch
0.0 days
Holding (excluded from total)
32.6 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Feb 20, 2026 (314 days early)
📅
31.6 days Total Age
⏱️
31.0d in Ready for Release Longest Stage
🔄
3 transitions Status Changes
On time Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
0 lines Work Details

AI Analysis

Powered by OpenAI
Generating AI analysis...
On Track
Canceled • 220 days old
🚨
Primary Delay 31.0 days stuck in "Ready for Release"

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
31.0d
Entered
0.0d / 0.5d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
2/20/2026jsells cancel and adding to repair WO-01352852
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Green Kiosk with a Wifi Installed and Storm Key pad

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01330266
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 31.0 business days
🆕
2 Status: Entered Feb 20, 5:13 PM
Status: Entered → Status: Canceled
🚫
Status: Canceled by Jessica Sells
From: Entered
To: Canceled
Duration in Previous: 1m

Bottlenecks

✅ No bottlenecks detected

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Canceled
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Unassigned
Scheduled
N/A
Created
Jan 6, 2:13 PM
Invoice #
N/A

Details