📍 Sam's Club #6472 — 3221 MANAWA SENTRE DRIVE, Council Bluffs IA, 51501
Jan 6, 2026 → May 7, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 6 biz days
Paused: 79 biz days
🕐 Clock stopped: Completed (May 7, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸74d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 23, 2026
74 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Entered
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 1 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Apr 23 → Apr 30, 2026
5 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 30 → Apr 30, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 30 → May 7, 2026
5 business days (counted)
Running total: 6 of ? biz days used
▶ Clock Running
Status: Tech On Site
May 7 → May 7, 2026
0 business days (counted)
Running total: 6 of ? biz days used
Created: Jan 6, 2026Completed: May 7, 2026
Show SLA Clock Detail (9 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Apr 23
Ready for Release
⏸ Paused
74
—
Apr 23 → Apr 23
Assigned
▶ Running
0
1
Apr 23 → Apr 23
Scheduled
▶ Running
0
1
Apr 23 → Apr 23
Entered
▶ Running
0
1
Apr 23 → Apr 30
Ready for Release
⏸ Paused
5
—
Apr 30 → Apr 30
Assigned
▶ Running
0
1
Apr 30 → May 7
Scheduled
▶ Running
5
6
May 7 → May 7
Tech On Site
▶ Running
0
6
Holding82.0d (excluded)
Coordinators5.9d
Field Work0.2d
Billing2.0d
✗ SLA Missed
Holding(excluded from total)
82.0 days
Coordinators
5.9 days
Over SLA
Field Work
0.2 days
Billing
2.0 days
Over SLA
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: May 7, 2026 (238 days early)
📅
85.6 daysTotal Age
⏱️
75.0d in Ready for ReleaseLongest Stage
🔄
10 transitionsStatus Changes
⚠️
5.6d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 220 days old
🚨
Primary Delay75.0 days stuck in "Ready for Release"
⏱️
Total Delay5.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
80.4d
Scheduled
5.9d / 2.0d SLA
Assigned
0.0d / 0.5d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
1.7d / 1.0d SLA
Ready to Bill
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
I arrived on location to perform pm I then open cabinet and placed black box on the unit and then placed keyboard and mouse to unit and enter system. Went through the pm procedures and ensuring sound worked. Unit did pass test. I then checked seat for weight and unit passed all test. I then calibrated the screen. At that time the screen froze up tried numerous time of resetting unit and keep getting the blue screen. I the called level 2 spoke to Emanuel emailed three pictures. So pm was a fail and new PC replacement is going to entered. I then blew out cabinet and cleaned and disinfected machine. Place pm sticker on unit. I got signature from point of contact and placed the unit back in service
🔍Technician Findings
Found unit in service
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Green Kiosk with 4G installed
📞
Call
Completed May 7, 2026
Field technician Daryll performed preventive maintenance (PM) on the kiosk. During the PM process, while attempting to calibrate the touchscreen, the PC became unresponsive and froze. An error message displayed. Will need a follow up for a new PC.
📅
WO-01330304 - Preventive Maintenance - DD: 12/31/2026 - - ZT2776-4G - Council Bluffs - Sam's Club #6472
May 7, 2026 11:30am – 12:30pm
Work Order: WO-01330304
Account: HIGI LLC
Customer Case Number:
Location: Sam's Club #6472
Address: 3221 MANAWA SENTRE DRIVE, Council Bluffs, IA 51501
Manufacturer: Higi
Model #: ZT2776-4G
Serial #: CSA-2016105628
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2026
Scheduled Date/Ti