Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 1 biz days
Paused: 55 biz days
🕐 Clock stopped: Canceled (Mar 27, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸55d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Mar 27, 2026
55 business days (not counted)
Created: Jan 6, 2026Canceled: Mar 27, 2026
Show SLA Clock Detail (2 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Mar 27
Ready for Release
⏸ Paused
55
—
Holding57.6d (excluded)
✗ SLA Missed
Holding(excluded from total)
57.6 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Mar 27, 2026 (279 days early)
📅
56.6 daysTotal Age
⏱️
56.0d in Ready for ReleaseLongest Stage
🔄
2 transitionsStatus Changes
✅
On timeTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
0 linesWork Details
AI Analysis
Powered by OpenAI
Generating AI analysis...
On Track
Canceled • 221 days old
🚨
Primary Delay56.0 days stuck in "Ready for Release"
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
56.0d
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/27 KKelch canceled to combine with repair WO-01361225
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Kiosk
Timeline
📋
Work Order Created Jan 6, 2:13 PM
Work Order:WO-01330340
Type:Preventive Maintenance
Priority:PSM
✅
Status: Ready for Release by Stephanie RamenJan 7, 10:03 AM