Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01330392 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Stop&Shop 505 — 1710 Avenue Y, Brooklyn NY, 11235

Jan 6, 2026 → Mar 11, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 2 biz days
Paused: 42 biz days
🕐 Clock stopped: Completed (Mar 11, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸42d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Mar 10, 2026
42 business days (not counted)
▶ Clock Running
Status: Assigned
Mar 10 → Mar 10, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Mar 10 → Mar 11, 2026
1 business day (counted)
Running total: 2 of ? biz days used
Created: Jan 6, 2026 Completed: Mar 11, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Mar 10 Ready for Release ⏸ Paused 42
Mar 10 → Mar 10 Assigned ▶ Running 0 1
Mar 10 → Mar 11 Scheduled ▶ Running 1 2
Holding 44.6d (excluded)
Coordinators 1.5d
Billing 0.0d
✗ SLA Missed
Holding (excluded from total)
44.6 days
Coordinators
1.5 days
Billing
0.0 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Mar 11, 2026 (295 days early)
📅
44.6 days Total Age
⏱️
43.0d in Ready for Release Longest Stage
🔄
5 transitions Status Changes
⚠️
0.1d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
4 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay 43.0 days stuck in "Ready for Release"
⏱️
Total Delay 0.1 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
43.0d
Scheduled
1.5d / 2.0d SLA
Closed
1.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
On arrival, unit was up and running. All LEDs we're on. Seat lock functioning. Only bottom screen was working.  Top display was not functioning. Opening the back door and manipulating wires on the PC and on back of the display still did not allow function.  Performed preventative maintenance procedures on this unit. Recalibrated scale, touch screen, verified BP. After cleaning and upon restart of the unit, the top display turned on again. While I was doing functional testing, top display began to flicker. Replacement of top display needed. Otherwise unit passes functional testing and remains in service. 
🔍 Technician Findings
On arrival, unit was up and running. All LEDs we're on. Seat lock functioning. Only bottom screen was working.  Top display was not functioning. Opening the back door and manipulating wires on the PC and on back of the display still did not allow function.  Performed preventative maintenance procedures on this unit. Recalibrated scale, touch screen, verified BP. After cleaning and upon restart of the unit, the top display turned on again. While I was doing functional testing, top display began to flicker. Replacement of top display needed. Otherwise unit passes functional testing and remains in service. 
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Merge KMY Kiosk

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01330392
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 43.0 business days
👷
3 Technician Assigned Mar 10, 4:10 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kourtney Smith
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 62d 5h, 0m
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-03-11T16:00:00.000+0000
2.0 business days
⏱️
2 4x Labor Added Mar 11, 7:01 PM
4x Labor Added → Status: Completed
✔️
Status: Completed by David Trost
From: Scheduled, Completed
To: Completed, Closed
Duration in Previous: 1d 2h, 0m
📄
2 Status: Ready to Bill Mar 12, 10:04 AM
Status: Ready to Bill → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 0m
3.0 business days
🧾
Invoice Created Mar 16, 8:51 PM
Invoice Number: SM-256278

Bottlenecks

Closed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.9 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
David Trost
Scheduled
Mar 11, 12:00 PM
Created
Jan 6, 2:13 PM
Invoice #
SM-256278

Work Details (4)

Name Type Status Qty Amount Date
WL-03140111 Labor Open 0.75 $0.00 Mar 11, 7:01 PM
WL-03140112 Labor Open 1 $0.00 Mar 11, 7:01 PM
WL-03140113 Expenses Open 1 $0.00 Mar 11, 7:01 PM
WL-03140114 Travel Open 15 $0.00 Mar 11, 7:01 PM

Details