Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (67 biz days late)
Active: 85 biz days
Paused: 10 biz days
🕐 Clock stopped: Completed (May 21, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸8d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jan 20, 2026
8 business days (not counted)
▶ Clock Running
Status: Assigned
Jan 20 → Jan 20, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Jan 20 → Jan 21, 2026
1 business day (counted)
Running total: 2 of ? biz days used
▶ Clock Running
Status: Entered
Jan 21 → Jan 21, 2026
0 business days (counted)
Running total: 2 of ? biz days used
82d
▶ Clock Running
Status: On Hold
Jan 21 → May 18, 2026
82 business days (counted)
Running total: 84 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
May 18 → May 20, 2026
2 business days (not counted)
▶ Clock Running
Status: Assigned
May 20 → May 20, 2026
0 business days (counted)
Running total: 84 of ? biz days used
▶ Clock Running
Status: Scheduled
May 20 → May 21, 2026
1 business day (counted)
Running total: 85 of ? biz days used
Created: Jan 6, 2026Completed: May 21, 2026
Show SLA Clock Detail (9 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jan 20
Ready for Release
⏸ Paused
8
—
Jan 20 → Jan 20
Assigned
▶ Running
0
1
Jan 20 → Jan 21
Scheduled
▶ Running
1
2
Jan 21 → Jan 21
Entered
▶ Running
0
2
Jan 21 → May 18
On Hold
▶ Running
82
84
May 18 → May 20
Ready for Release
⏸ Paused
2
—
May 20 → May 20
Assigned
▶ Running
0
84
May 20 → May 21
Scheduled
▶ Running
1
85
Holding96.6d (excluded)
Coordinators4.0d
Field Work0.0d
Billing0.1d
✗ SLA Missed
Holding(excluded from total)
96.6 days
Coordinators
4.0 days
Field Work
0.0 days
Billing
0.1 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: May 21, 2026 (224 days early)
📅
95.6 daysTotal Age
⏱️
83.0d in On HoldLongest Stage
🔄
9 transitionsStatus Changes
⚠️
0.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay83.0 days stuck in "On Hold"
⏱️
Total Delay0.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
84.6d
Ready for Release
12.0d
Scheduled
4.0d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.1d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
On arrival, unit up and running. LEDs functioning. Top and bottom displays functioning. Seat lock functioning.
Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
🔍Technician Findings
On arrival, unit up and running. LEDs functioning. Top and bottom displays functioning. Seat lock functioning.
Performed and completed preventative maintenance procedures on this unit. Unit passes functional testing and has been returned to service.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Station WI-FI
May 18, 2026 9:16am
@Nicole Floyd Found this one whiled checking for open orders. It is on hold. Notes state: Placing on hold due to repairs. I do not see an open repair. (I do have a CF for connectivity today) Please advise if this should be on hold. @Jessica Foley
May 18, 2026 10:45am
Hi @Kourtney Smith Little help here? Could you please clarify why the PM for this station was placed on hold. What repairs are needed and where is it documented so that action can be taken to address those repairs?
Also why was "4a Labor Driven – Technician Unavailable" added to this WO?