Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 11 biz days
Paused: 89 biz days
🕐 Clock stopped: Completed (May 29, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jan 15, 2026
6 business days (not counted)
▶ Clock Running
Status: Entered
Jan 15 → Jan 15, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Canceled
Jan 15 → Jan 16, 2026
1 business day (counted)
Running total: 2 of ? biz days used
⏸83d
⏸ Clock Paused
Status: Ready for Release
Jan 16 → May 15, 2026
83 business days (not counted)
▶ Clock Running
Status: Assigned
May 15 → May 15, 2026
0 business days (counted)
Running total: 2 of ? biz days used
9d
▶ Clock Running
Status: Scheduled
May 15 → May 29, 2026
9 business days (counted)
Running total: 11 of ? biz days used
▶ Clock Running
Status: Tech On Site
May 29 → May 29, 2026
0 business days (counted)
Running total: 11 of ? biz days used
Created: Jan 6, 2026Completed: May 29, 2026
Show SLA Clock Detail (8 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jan 15
Ready for Release
⏸ Paused
6
—
Jan 15 → Jan 15
Entered
▶ Running
0
1
Jan 15 → Jan 16
Canceled
▶ Running
1
2
Jan 16 → May 15
Ready for Release
⏸ Paused
83
—
May 15 → May 15
Assigned
▶ Running
0
2
May 15 → May 29
Scheduled
▶ Running
9
11
May 29 → May 29
Tech On Site
▶ Running
0
11
Holding92.2d (excluded)
Coordinators9.3d
Field Work0.1d
Billing0.3d
✗ SLA Missed
Holding(excluded from total)
92.2 days
Coordinators
9.3 days
Over SLA
Field Work
0.1 days
Billing
0.3 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: May 29, 2026 (216 days early)
📅
100.6 daysTotal Age
⏱️
83.6d in Ready for ReleaseLongest Stage
🔄
10 transitionsStatus Changes
⚠️
7.6d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
7 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay83.6 days stuck in "Ready for Release"
⏱️
Total Delay7.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
90.6d
Canceled
1.7d
Scheduled
9.3d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.4d / 1.0d SLA
Ready to Bill
0.3d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
6.1.26 hshaw - missing pic of showing loc
1/15/26 lcoonrod cancelling PM and adding to repai WO-01338072
🔧Work Performed
The surge protector needs to be replaced. The pressure test did not pass. The kiosk failed the PM.
🔍Technician Findings
The kiosk was functional but the surge protector ground prong was broken.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Merge KMY Kiosk
Jun 1, 2026 12:26pm
@Robert Lewis missing pic of showing loc, please attach.