Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 1 biz days
Paused: 107 biz days
🕐 Clock stopped: Canceled (Jun 10, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸107d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jun 10, 2026
107 business days (not counted)
Created: Jan 6, 2026Canceled: Jun 10, 2026
Show SLA Clock Detail (2 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jun 10
Ready for Release
⏸ Paused
107
—
Holding109.6d (excluded)
✗ SLA Missed
Holding(excluded from total)
109.6 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Jun 10, 2026 (204 days early)
📅
108.6 daysTotal Age
⏱️
108.0d in Ready for ReleaseLongest Stage
🔄
2 transitionsStatus Changes
✅
On timeTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
0 linesWork Details
AI Analysis
Powered by OpenAI
Generating AI analysis...
On Track
Canceled • 221 days old
🚨
Primary Delay108.0 days stuck in "Ready for Release"
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
108.0d
💬 Activities, Notes & Communications
🔒Internal CSA Notes
6/10/26 SReich - Creating a repair/PM.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Merge KMY Kiosk
Timeline
📋
Work Order Created Jan 6, 2:13 PM
Work Order:WO-01330566
Type:Preventive Maintenance
Priority:PSM
✅
Status: Ready for Release by Stephanie RamenJan 7, 10:03 AM