Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01330636 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Publix 1338 — 10250 Curry Ford Road, Orlando FL, 32825

Jan 6, 2026 → Apr 8, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 1 biz days
Paused: 63 biz days
🕐 Clock stopped: Completed (Apr 8, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸63d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 8, 2026
63 business days (not counted)
▶ Clock Running
Status: Scheduled
Apr 8 → Apr 8, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Tech On Site
Apr 8 → Apr 8, 2026
0 business days (counted)
Running total: 1 of ? biz days used
Created: Jan 6, 2026 Completed: Apr 8, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Apr 8 Ready for Release ⏸ Paused 63
Apr 8 → Apr 8 Scheduled ▶ Running 0 1
Apr 8 → Apr 8 Tech On Site ▶ Running 0 1
Holding 65.6d (excluded)
Coordinators 0.8d
Field Work 0.2d
Billing 0.1d
✗ SLA Missed
Holding (excluded from total)
65.6 days
Coordinators
0.8 days
Field Work
0.2 days
Billing
0.1 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Apr 8, 2026 (267 days early)
📅
64.6 days Total Age
⏱️
64.0d in Ready for Release Longest Stage
🔄
8 transitions Status Changes
⚠️
1.3d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
6 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay 64.0 days stuck in "Ready for Release"
⏱️
Total Delay 1.3 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
64.0d
Scheduled
0.8d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.3d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
Completed Higi PM. The seat assembly moves too much when locked.. The seat magnet assembly needs to be replaced
🔍 Technician Findings
Kiosk was functioning normally.
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Station with 3G installed

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01330636
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 64.0 business days
🗓️
3 Status: Scheduled Apr 8, 9:38 AM
Status: Scheduled → Dispatch Scheduled → Technician Assigned
📅
Dispatch Scheduled by Abby Jinerson
Scheduled For: 2026-04-08T19:00:00.000+0000, 2026-04-08T18:00:00.000+0000, 2026-04-08T18:30:00.000+0000
👷
Technician Assigned by Abby Jinerson
Technician: Robert Lewis
🔧
Status: Tech On Site by Robert Lewis Apr 8, 3:54 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 6h 16m
🚗
3 3x Travel Added Apr 8, 5:19 PM
3x Travel Added → Status: Completed → 3x Labor Added
✔️
Status: Completed by Robert Lewis
From: Tech On Site
To: Completed
Duration in Previous: 1h 24m
⏱️
3x Labor Added
Type: Labor
Status: Open
Qty: 0.45, 1, 0.5
🏁
Status: Closed by Robert Lewis Apr 8, 5:26 PM
From: Completed
To: Closed
Duration in Previous: 6m
2.8 business days
📄
Status: Ready to Bill by Hannah Shaw Apr 10, 4:06 PM
From: Closed
To: Ready to Bill
Duration in Previous: 1d 22h
📨
2 Status: Invoice Pending Apr 10, 5:04 PM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
1.9 business days
🧾
Invoice Created Apr 13, 8:35 AM
Invoice Number: SM-259027

Bottlenecks

Closed
Duration: 2.3 business days (threshold: 1.0 business days)
Exceeded by 1.3 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Robert Lewis
Scheduled
Apr 8, 2:30 PM
Created
Jan 6, 2:13 PM
Invoice #
SM-259027

Work Details (6)

Name Type Status Qty Amount Date
WL-03178321 Travel Open 19 $0.00 Apr 8, 5:19 PM
WL-03178322 Travel Open 5 $0.00 Apr 8, 5:19 PM
WL-03178323 Expenses Open 1 $0.00 Apr 8, 5:19 PM
WL-03178345 Labor Open 0.45 $0.00 Apr 8, 5:22 PM
WL-03178346 Labor Open 1 $0.00 Apr 8, 5:22 PM
WL-03178347 Labor Open 0.5 $0.00 Apr 8, 5:22 PM

Details