Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01330653 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Publix 1296 — 13390 Perdido Key Drive, Pensacola FL, 32507

Jan 6, 2026 → Mar 10, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 7 biz days
Paused: 36 biz days
🕐 Clock stopped: Completed (Mar 10, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸36d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Mar 2, 2026
36 business days (not counted)
6d
▶ Clock Running
Status: Scheduled
Mar 2 → Mar 10, 2026
6 business days (counted)
Running total: 7 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 10 → Mar 10, 2026
0 business days (counted)
Running total: 7 of ? biz days used
Created: Jan 6, 2026 Completed: Mar 10, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Mar 2 Ready for Release ⏸ Paused 36
Mar 2 → Mar 10 Scheduled ▶ Running 6 7
Mar 10 → Mar 10 Tech On Site ▶ Running 0 7
Holding 38.6d (excluded)
Coordinators 6.3d
Field Work 0.1d
Billing 0.0d
✗ SLA Missed
Holding (excluded from total)
38.6 days
Coordinators
6.3 days
Over SLA
Field Work
0.1 days
Billing
0.0 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Mar 10, 2026 (296 days early)
📅
43.6 days Total Age
⏱️
37.0d in Ready for Release Longest Stage
🔄
7 transitions Status Changes
⚠️
5.3d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay 37.0 days stuck in "Ready for Release"
⏱️
Total Delay 5.3 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
37.0d
Scheduled
6.3d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
Completed PM Service
🔍 Technician Findings
Kiosk is operational. Touchscreen very difficult to type correctly after calibrating 3 times. BP assembly not holding pressure per standard pressure drop test, leaking.
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Station with 3G installed

Timeline

📋
Work Order Created Jan 6, 2:13 PM
Work Order: WO-01330653
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 37.0 business days
👷
3 Technician Assigned Mar 2, 4:52 PM
Technician Assigned → Dispatch Scheduled → Status: Scheduled
📅
Dispatch Scheduled by Abby Jinerson
Scheduled For: 2026-03-05T20:15:00.000+0000, 2026-03-05T20:00:00.000+0000
🗓️
Status: Scheduled by Abby Jinerson
From: Ready for Release
To: Scheduled
Duration in Previous: 54d 6h
2.9 business days
📅
Dispatch Scheduled by Abby Jinerson Mar 4, 4:42 PM
Scheduled For: 2026-03-09T19:00:00.000+0000
2.9 business days
📅
Dispatch Scheduled by Abby Jinerson Mar 6, 10:24 AM
Scheduled For: 2026-03-09T20:00:00.000+0000
📅
2 Dispatch Scheduled Mar 6, 3:35 PM
Dispatch Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Abby Jinerson
Scheduled For: 2026-03-10T21:30:00.000+0000, 2026-03-10T18:30:00.000+0000
3.0 business days
🔧
Status: Tech On Site by Craig Walker Mar 10, 10:14 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 16h
🚗
2x Travel Added Mar 10, 10:37 AM
Type: Travel, Labor
Status: Open
Qty: 27, 1.75
⏱️
2 Labor Added Mar 10, 10:55 AM
Labor Added → Status: Completed
✔️
Status: Completed by Craig Walker
From: Tech On Site
To: Completed
Duration in Previous: 42m
🏁
Status: Closed by Craig Walker Mar 10, 11:04 AM
From: Completed
To: Closed
Duration in Previous: 7m
2.0 business days
📄
2 Status: Ready to Bill Mar 11, 12:03 PM
Status: Ready to Bill → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 0m
3.0 business days
🧾
Invoice Created Mar 14, 8:53 AM
Invoice Number: SM-256175

Bottlenecks

Scheduled
Duration: 6.3 business days (threshold: 2.0 business days)
Exceeded by 4.3 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Craig Walker
Scheduled
Mar 10, 2:30 PM
Created
Jan 6, 2:13 PM
Invoice #
SM-256175

Work Details (3)

Name Type Status Qty Amount Date
WL-03137098 Travel Open 27 $0.00 Mar 10, 10:37 AM
WL-03137099 Labor Open 1.75 $0.00 Mar 10, 10:37 AM
WL-03137130 Labor Open 1 $0.00 Mar 10, 10:55 AM

Details