Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01330876 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Cub Pharmacy #1695 — 1276 Town Centre Drive, Eagan MN, 55123

Jan 6, 2026 → Feb 12, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 6 biz days
Paused: 20 biz days
🕐 Clock stopped: Completed (Feb 12, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸20d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 5, 2026
20 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 5 → Feb 5, 2026
0 business days (counted)
Running total: 1 of ? biz days used
5d
▶ Clock Running
Status: Scheduled
Feb 5 → Feb 12, 2026
5 business days (counted)
Running total: 6 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 12 → Feb 12, 2026
0 business days (counted)
Running total: 6 of ? biz days used
Created: Jan 6, 2026 Completed: Feb 12, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Feb 5 Ready for Release ⏸ Paused 20
Feb 5 → Feb 5 Assigned ▶ Running 0 1
Feb 5 → Feb 12 Scheduled ▶ Running 5 6
Feb 12 → Feb 12 Tech On Site ▶ Running 0 6
Holding 22.6d (excluded)
Coordinators 5.8d
Field Work 0.2d
Billing 0.0d
✗ SLA Missed
Holding (excluded from total)
22.6 days
Coordinators
5.8 days
Over SLA
Field Work
0.2 days
Billing
0.0 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Feb 12, 2026 (322 days early)
📅
26.6 days Total Age
⏱️
21.0d in Ready for Release Longest Stage
🔄
7 transitions Status Changes
⚠️
5.9d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay 21.0 days stuck in "Ready for Release"
⏱️
Total Delay 5.9 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
21.0d
Scheduled
5.8d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
3.2d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
2/12/26 Traveled to site Found unit online Completed PM Unit did not hold pressure for 60 seconds The seat is missing two screws (see pictures of screws required Completed paperwork
🔍 Technician Findings
Unit is online Unit did not pass pressure test for 60 seconds Unit is missing screws for back panel and under seat
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Kiosk

Timeline

📋
Work Order Created Jan 6, 2:14 PM
Work Order: WO-01330876
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 49m
🚨 21.0 business days
👷
3 Technician Assigned Feb 5, 12:50 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Charles Ramen
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 29d 2h, 0m
📅
Dispatch Scheduled by Charles Ramen
Scheduled For: 2026-02-12T18:00:00.000+0000, 2026-02-12T18:30:00.000+0000
⚠️ 5.9 business days
📅
Dispatch Scheduled by Ronnie Salone Feb 12, 7:13 AM
Scheduled For: 2026-02-12T20:00:00.000+0000, 2026-02-12T19:00:00.000+0000
📅
2 Dispatch Scheduled Feb 12, 7:36 AM
Dispatch Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Ronnie Salone
Scheduled For: 2026-02-12T19:30:00.000+0000
📅
Dispatch Scheduled by Ronnie Salone Feb 12, 2:11 PM
Scheduled For: 2026-02-12T20:15:00.000+0000
📅
Dispatch Scheduled by Ronnie Salone Feb 12, 3:12 PM
Scheduled For: 2026-02-12T20:30:00.000+0000
📅
2 Dispatch Scheduled Feb 12, 3:29 PM
Dispatch Scheduled → 2x Labor Added
⏱️
2x Labor Added
Type: Labor, Travel
Status: Open
Qty: 0.25
🔧
Status: Tech On Site by Ronnie Salone Feb 12, 3:44 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 2h
✔️
2 Status: Completed Feb 12, 5:07 PM
Status: Completed → Labor Added
⏱️
Labor Added
Type: Labor
Status: Open
Qty: 1.25
🏁
Status: Closed by Ronnie Salone Feb 12, 5:30 PM
From: Completed
To: Closed
Duration in Previous: 22m
3.2 business days
📄
Status: Ready to Bill by Hannah Shaw Feb 18, 2:49 AM
From: Closed
To: Ready to Bill
Duration in Previous: 5d 9h
📨
2 Status: Invoice Pending Feb 18, 3:11 AM
Status: Invoice Pending → Invoice Created
🧾
Invoice Created
Invoice Number: SM-254248

Bottlenecks

Scheduled
Duration: 5.8 business days (threshold: 2.0 business days)
Exceeded by 3.8 business days
Closed
Duration: 3.2 business days (threshold: 1.0 business days)
Exceeded by 2.2 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Ronnie Salone
Scheduled
Feb 12, 3:45 PM
Created
Jan 6, 2:14 PM
Invoice #
SM-254248

Work Details (3)

Name Type Status Qty Amount Date
WL-03103262 Labor Open 0.25 $0.00 Feb 12, 3:33 PM
WL-03103263 Travel Open 5 $0.00 Feb 12, 3:33 PM
WL-03103482 Labor Open 1.25 $0.00 Feb 12, 5:10 PM

Details