Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01331139 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Meijer 682 — 5956 Promenade Shops Blvd, Noblesville IN, 46062

Jan 6, 2026 → Feb 16, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 5 biz days
Paused: 22 biz days
🕐 Clock stopped: Completed (Feb 16, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸22d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 9, 2026
22 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 9 → Feb 9, 2026
0 business days (counted)
Running total: 1 of ? biz days used
4d
▶ Clock Running
Status: Scheduled
Feb 9 → Feb 13, 2026
4 business days (counted)
Running total: 5 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 13 → Feb 16, 2026
0 business days (counted)
Running total: 5 of ? biz days used
Created: Jan 6, 2026 Completed: Feb 16, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Feb 9 Ready for Release ⏸ Paused 22
Feb 9 → Feb 9 Assigned ▶ Running 0 1
Feb 9 → Feb 13 Scheduled ▶ Running 4 5
Feb 13 → Feb 16 Tech On Site ▶ Running 0 5
Holding 24.6d (excluded)
Coordinators 4.6d
Field Work 0.7d
Billing 0.0d
✗ SLA Missed
Holding (excluded from total)
24.6 days
Coordinators
4.6 days
Over SLA
Field Work
0.7 days
Billing
0.0 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Feb 16, 2026 (318 days early)
📅
27.6 days Total Age
⏱️
23.0d in Ready for Release Longest Stage
🔄
8 transitions Status Changes
⚠️
8.4d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 219 days old
🚨
Primary Delay 23.0 days stuck in "Ready for Release"
⏱️
Total Delay 8.4 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
23.0d
Assigned
0.0d / 0.5d SLA
Scheduled
4.6d / 2.0d SLA
Tech On Site
0.7d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
6.9d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
PM
🔍 Technician Findings
System online
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Station Hardwired

Timeline

📋
Work Order Created Jan 6, 2:14 PM
Work Order: WO-01331139
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 48m
🚨 23.0 business days
👷
4 Technician Assigned Feb 9, 2:31 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled → Status: Scheduled
👷
Status: Assigned by Charles Ramen
From: Ready for Release
To: Assigned
Duration in Previous: 33d 4h
📅
Dispatch Scheduled by Charles Ramen
Scheduled For: 2026-02-10T21:00:00.000+0000
🗓️
Status: Scheduled by Charles Ramen
From: Assigned
To: Scheduled
Duration in Previous: 2m
📅
Dispatch Scheduled by Charles Ramen Feb 10, 10:50 AM
Scheduled For: 2026-02-10T23:00:00.000+0000
📅
Dispatch Scheduled by Charles Ramen Feb 10, 10:56 AM
Scheduled For: 2026-02-12T18:30:00.000+0000, 2026-02-12T14:00:00.000+0000
📅
Dispatch Scheduled by Charles Ramen Feb 11, 8:58 AM
Scheduled For: 2026-02-13T14:00:00.000+0000
2.0 business days
📅
Dispatch Scheduled by Charles Ramen Feb 12, 12:39 PM
Scheduled For: 2026-02-13T15:00:00.000+0000
📅
Dispatch Scheduled by Charles Ramen Feb 12, 2:44 PM
Scheduled For: 2026-02-13T14:30:00.000+0000
🔧
Status: Tech On Site by Vincent Nyathi Feb 13, 1:28 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 3d 22h
1.0 business days
✔️
Status: Completed by Vincent Nyathi Feb 15, 9:21 PM
From: Tech On Site
To: Completed
Duration in Previous: 2d 7h
⏱️
2 3x Labor Added Feb 16, 8:54 AM
3x Labor Added → Status: Closed
🏁
Status: Closed by Vincent Nyathi
From: Completed
To: Closed
Duration in Previous: 11h 34m
⚠️ 6.2 business days
📄
Status: Ready to Bill by Hannah Shaw Feb 25, 1:51 AM
From: Closed
To: Ready to Bill
Duration in Previous: 8d 16h
📨
2 Status: Invoice Pending Feb 25, 2:10 AM
Status: Invoice Pending → Invoice Created
🧾
Invoice Created
Invoice Number: SM-254825

Bottlenecks

Scheduled
Duration: 4.6 business days (threshold: 2.0 business days)
Exceeded by 2.6 business days
Closed
Duration: 6.9 business days (threshold: 1.0 business days)
Exceeded by 5.9 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Vincent Nyathi
Scheduled
Feb 13, 9:30 AM
Created
Jan 6, 2:14 PM
Invoice #
SM-254825

Work Details (3)

Name Type Status Qty Amount Date
WL-03106842 Labor Open 1 $0.00 Feb 16, 8:54 AM
WL-03106843 Labor Open 0.41666666666667 $0.00 Feb 16, 8:54 AM
WL-03106844 Travel Open 11 $0.00 Feb 16, 8:54 AM

Details