📍 Premise Health Moulton — 10 Moulton, Cambridge MA, 02138
Jan 7, 2026 → May 4, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 7 biz days
Paused: 74 biz days
🕐 Clock stopped: Completed (May 4, 2026)
▶ Clock Running
Status: Created
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
⏸74d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 23, 2026
74 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Apr 23 → Apr 24, 2026
1 business day (counted)
Running total: 1 of ? biz days used
6d
▶ Clock Running
Status: Scheduled
Apr 24 → May 4, 2026
6 business days (counted)
Running total: 7 of ? biz days used
Created: Jan 7, 2026Completed: May 4, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 7 → Jan 7
Created
▶ Running
0
0
Jan 7 → Jan 7
Ready for Scheduling
▶ Running
0
0
Jan 7 → Apr 23
Ready for Release
⏸ Paused
74
—
Apr 23 → Apr 23
Ready for Scheduling
▶ Running
0
0
Apr 23 → Apr 24
Assigned
▶ Running
1
1
Apr 24 → May 4
Scheduled
▶ Running
6
7
Dispatch0.3d
Holding74.3d (excluded)
Coordinators9.2d
Field Work0.0d
Billing2.0d
✗ SLA Missed
Dispatch
0.3 days
Holding(excluded from total)
74.3 days
Coordinators
9.2 days
Over SLA
Field Work
0.0 days
Billing
2.0 days
Over SLA
Created: Jan 7, 2026
Due: Feb 28, 2026
Completed: May 4, 2026 (64 days late)
📅
82.0 daysTotal Age
⏱️
74.3d in Ready for ReleaseLongest Stage
🔄
10 transitionsStatus Changes
⚠️
7.4d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay74.3 days stuck in "Ready for Release"
⏱️
Total Delay7.4 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.3d / 0.5d SLA
Ready for Scheduling
0.7d / 1.0d SLA
Ready for Release
74.3d
Assigned
1.5d / 0.5d SLA
Scheduled
7.0d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.4d / 1.0d SLA
Ready to Bill
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
4/24 KSmith -- Scheduled for 5/4 with Janet. Anytime after 1pm
4/23 KSmith -- Sent email to schedule for 5/4
🔧Work Performed
**PM Completed
**Function tested
**Wiped down kiosk with disinfectant cleaner
**Check and tested BP for leakage and over pressure switch.
**Calibrated unit
**Checked power cord condition.
**Confirm plexi board is not broken and ads are current.
🔍Technician Findings
Unit in service
⚠️Problem Description
Please Perform the PM for this Kiosk based on the product listed in the work order: 90550, LC300, LC500.
***IMPORTANT CHANGE****
Please Log/notate in the technician findings the number of times the kiosk was used and double check the SN. If the SN is different than in the work order please also notate the correct SN. Regardless if the SN matches continue to perform the PM service.
If location is a non-retail location a call ahead to schedule is required
PM Checklist Tips:
If Checklist is not populating, make sure the order type contains 'PM' and the product must contain an 90550, LC300 or LC500. Update the order status to 'tech onsite' and the workflow will look for the parameters in which a PM checklist is required and will auto attach.
Common missed step: After you Finalize the checklist you must select 'Print checklist' for the checklist to attach to the work order for the billing reviewer to review.
**IMPORTANT** This is a Non Retail location and a scheduled appointment must be made in advance to ensure the machine will be made available prior to tech arrival on site. If a work market technician has to be used SDL must obtain approval from Higi prior to scheduling work. If the technician is unable to make contact on the first attempt, email EMSAR at higisupport@emsar.com so HIGI can be notified to provide us with an alternate contact name and number. Any calls made MUST be logged on the work order under Activity History with who you spoke to and date/time of call
From: Janet.H.Kaczenski@rtx.com
To: ksmith@emsar.com
Thank you!
Janet Kaczenski, MS, CIH
Environment, Health and Safety (EH&S)
O: +1 617.873.3557
C: +1 781.460.8124
janet.h.kaczenski@rtx.com <mailto:janet.h.kaczenski@rtx.com>
RTX BBN Technologies
10 Moulton Street
Cambridge, MA 02138
From: Kourtney Smith <ksmith@emsar.com>
Sent: Monday, April 27, 2026 8:20 AM
To: Kaczenski, Janet H (USA) <Janet.H.Kaczenski@rtx.com>
Subject: RE: Premise Heal
From: Janet.H.Kaczenski@rtx.com
To: ksmith@emsar.com
Cc: Janet.H.Kaczenski@rtx.com
That will work. I also need to enter the technician in our visitor management system and will need the following information:
* Technician first, middle, and last names
* Company name and address
* Technician email and work telephone
* Is technician a U.S. citizen? Yes/No
Thank you,
Janet
Janet Kaczenski, MS, CIH
Environment, Health and Safety (EH&S)
O: +1 617.873.3557
From: Janet.H.Kaczenski@rtx.com
To: ksmith@emsar.com
This is the first time you received an email from this sender (Janet.H.Kaczenski@rtx.com). Exercise caution when clicking links, opening attachments or taking further action, before validating its authenticity.
Hi Kourtney,
Do you know what time the technician would arrive? I am asking because I have to attend a training session from 11AM – 1 PM. Would it be possible for the technician to come after 1 PM?
Janet Kaczenski,
To: janet.h.kaczenski@rtx.com
CC:
BCC:
Attachment: --none--
Subject: Premise Health Moulton -- Kiosk Blood Pressure Machine PM -- WO-01333877
Body:
Hi Janet,
My name is Kourtney and I'm with EMSAR. We received a request from Texas Medical to come onsite and complete the annual preventative maintenance on the kiosk blood pressure machine at your facility.
Would Monday, May 4th work for the technician to come onsite and service the unit?
BEST REGARDS,
KOURTNEY SMITH
ACCOUNT SERVICE COORDINA