Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01333910 ↗ ServiceMax

TEXAS MEDICAL SCREENING • Preventive Maintenance • PSM

📍 B&R Super Save #9 — 2662 Cornhusker Hwy, Lincoln NE, 68521

Jan 7, 2026 → Apr 28, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 3 biz days
Paused: 74 biz days
🕐 Clock stopped: Completed (Apr 28, 2026)
▶ Clock Running
Status: Created
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
⏸74d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 23, 2026
74 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 23 → Apr 28, 2026
3 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Tech On Site
Apr 28 → Apr 28, 2026
0 business days (counted)
Running total: 3 of ? biz days used
Created: Jan 7, 2026 Completed: Apr 28, 2026
Show SLA Clock Detail (7 periods)
Period Status Clock Biz Days Running Total
Jan 7 → Jan 7 Created ▶ Running 0 0
Jan 7 → Jan 7 Ready for Scheduling ▶ Running 0 0
Jan 7 → Apr 23 Ready for Release ⏸ Paused 74
Apr 23 → Apr 23 Ready for Scheduling ▶ Running 0 0
Apr 23 → Apr 23 Assigned ▶ Running 0 0
Apr 23 → Apr 28 Scheduled ▶ Running 3 3
Apr 28 → Apr 28 Tech On Site ▶ Running 0 3
Dispatch 0.3d
Holding 74.3d (excluded)
Coordinators 4.2d
Field Work 0.2d
Billing 0.1d
✗ SLA Missed
Dispatch
0.3 days
Holding (excluded from total)
74.3 days
Coordinators
4.2 days
Over SLA
Field Work
0.2 days
Billing
0.1 days
Created: Jan 7, 2026 Due: Apr 30, 2026 Completed: Apr 28, 2026 (2 days early)
📅
78.0 days Total Age
⏱️
74.3d in Ready for Release Longest Stage
🔄
10 transitions Status Changes
⚠️
2.3d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay 74.3 days stuck in "Ready for Release"
⏱️
Total Delay 2.3 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.3d / 0.5d SLA
Ready for Scheduling
0.6d / 1.0d SLA
Ready for Release
74.3d
Scheduled
3.6d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.7d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
I arrived on location found said unit. I then removed the the cover then installed manometer to the unit when doing the test with manometer the unit would not hold pressure and causing the unit to fail. Also when doing test with forearm in cuff unit would pump up and release the pump up and released did that numerous time unit need L assembly replacement
🔍 Technician Findings
Pm of unit unit failed
⚠️ Problem Description
Please Perform the PM for this Kiosk based on the product listed in the work order: 90550, LC300, LC500. ***IMPORTANT CHANGE**** Please Log/notate in the technician findings the number of times the kiosk was used and double check the SN. If the SN is different than in the work order please also notate the correct SN. Regardless if the SN matches continue to perform the PM service. If location is a non-retail location a call ahead to schedule is required PM Checklist Tips: If Checklist is not populating, make sure the order type contains 'PM' and the product must contain an 90550, LC300 or LC500. Update the order status to 'tech onsite' and the workflow will look for the parameters in which a PM checklist is required and will auto attach. Common missed step: After you Finalize the checklist you must select 'Print checklist' for the checklist to attach to the work order for the billing reviewer to review.
📄 Description
90550,BP MONITOR,AD DISP,NO LIGHT

Timeline

📋
Work Order Created Jan 7, 11:09 AM
Work Order: WO-01333910
Type: Preventive Maintenance
Priority: PSM
📅
Status: Ready for Scheduling by Jessica Foley Jan 7, 1:34 PM
From: Entered
To: Ready for Scheduling
Duration in Previous: 2h 25m
Status: Ready for Release by Allison Belyea Jan 7, 4:37 PM
From: Ready for Scheduling
To: Ready for Release
Duration in Previous: 3h 2m
🚨 74.9 business days
📅
Status: Ready for Scheduling by Chris Bakkemo Apr 23, 1:41 PM
From: Ready for Release
To: Ready for Scheduling
Duration in Previous: 105d 20h
👷
3 Technician Assigned Apr 23, 3:09 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling, Assigned
To: Assigned, Scheduled
Duration in Previous: 1h 28m, 0m
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-04-28T20:30:00.000+0000
📅
2 Dispatch Scheduled Apr 23, 3:16 PM
Dispatch Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-04-28T15:30:00.000+0000
4.0 business days
🔧
Status: Tech On Site by Darrell Hendrix Apr 28, 12:38 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 4d 21h
⏱️
3x Labor Added Apr 28, 12:49 PM
Type: Labor, Travel
Status: Open
Qty: 0.33333333333333, 1, 12
✔️
2 Status: Completed Apr 28, 2:10 PM
Status: Completed → Status: Closed
🏁
Status: Closed by Darrell Hendrix
From: Completed
To: Closed
Duration in Previous: 3m
📄
Status: Ready to Bill by Hannah Shaw Apr 29, 10:29 AM
From: Closed
To: Ready to Bill
Duration in Previous: 20h 15m
📨
2 Status: Invoice Pending Apr 29, 11:14 AM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
3.0 business days
🧾
Invoice Created May 1, 10:30 PM
Invoice Number: SM-260402

Bottlenecks

Scheduled
Duration: 3.6 business days (threshold: 2.0 business days)
Exceeded by 1.6 business days
Closed
Duration: 1.7 business days (threshold: 1.0 business days)
Exceeded by 5.8 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Darrell Hendrix
Scheduled
Apr 28, 11:30 AM
Created
Jan 7, 11:09 AM
Invoice #
SM-260402

Work Details (3)

Name Type Status Qty Amount Date
WL-03203625 Labor Open 0.33333333333333 $0.00 Apr 28, 12:49 PM
WL-03203626 Labor Open 1 $0.00 Apr 28, 12:49 PM
WL-03203627 Travel Open 12 $0.00 Apr 28, 12:49 PM

Details